Laserfiche WebLink
1 <br /> ' 3.4 TESTING <br /> 1 A. Prior to operation, pressure test temporary piping to a pressure no less than 50 psi above the <br /> highest pressure output of the pump system. Submit test results to Engineer. <br /> B. Prior to operation, provide a functional test for the complete temporary pumping system <br /> including pumps, valves, alarms,telemetry, and redundancy. <br /> END OF SECTION <br /> 1 <br /> i <br /> I <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> r <br /> 1 <br /> Legion Golf Course Stormwater Detention Project Temporary Sewage Control&Bypass Pumping <br /> WO#UP3620 01 57 19.11 - 5 <br />