My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Overflow float shall be set above the high level alarm float and shall send an overflow <br /> alarm via the autodialer. <br /> 3. Coordinate primary level control and alarm float elevations with the ENGINEER. <br /> 2.2 TEMPORARY PIPING I <br /> A. Provide temporary piping, valves, and fittings for temporary pumping equipment, using sizes <br /> and types shown in the Drawings. <br /> B. Provide pipe and couplings rated for a minimum pressure of 50 psi above the highest pressure <br /> output of the pump system. <br /> 2.3 DIESEL EQUIPMENT SPILL CONTAINMENT <br /> A. Secondary spill containment berms shall be provided for all diesel fueled equipment. Spill <br /> containment berm shall be made of 40 mil Linear Low Density Polyethylene material with <br /> minimum 12"tall aluminum L-Bracket wall supports. <br /> PART 3 EXECUTION <br /> 3.1 OPERATION I <br /> A. Contractor shall be responsible for all costs associated with temporary pumping, including <br /> temporary electric service, temporary standby power, all electricity usage and fuel to operate <br /> the temporary pumps and controls. <br /> B. Respond to and resolve all alarms from temporary pumping operations. Have personnel <br /> available to respond to an alarm within 30 minutes. <br /> C. Ensure temporary bypass pumps are maintained and remain operational 24 hours per day, 7 <br /> days per week for the duration of any planned bypass. <br /> D: Notify Owner immediately in the event of a high level or overflow alarm. Owner will provide <br /> names and telephone numbers of personnel to be contacted in the case of an alarm or other <br /> emergency. <br /> 3.2 STAFFING ' <br /> A. Provide a minimum of one operator for temporary pumping at all times that the pumps are in <br /> operation,unless pumps are automatically controlled in accordance with this Section. <br /> 1 <br /> 3.3 TEMPORARY PIPING <br /> A. Route temporary piping to avoid blocking construction and maintenance equipment access. ' <br /> B. Provide protection for piping and couplings where crossing access points in unavoidable. <br /> Legion Golf Course Stormwater Detention Project Temporary Sewage Control&Bypass Pumping <br /> WO#UP3620 01 57 19.11 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.