Laserfiche WebLink
2. Overflow float shall be set above the high level alarm float and shall send an overflow <br /> alarm via the autodialer. <br /> 3. Coordinate primary level control and alarm float elevations with the ENGINEER. <br /> 2.2 TEMPORARY PIPING I <br /> A. Provide temporary piping, valves, and fittings for temporary pumping equipment, using sizes <br /> and types shown in the Drawings. <br /> B. Provide pipe and couplings rated for a minimum pressure of 50 psi above the highest pressure <br /> output of the pump system. <br /> 2.3 DIESEL EQUIPMENT SPILL CONTAINMENT <br /> A. Secondary spill containment berms shall be provided for all diesel fueled equipment. Spill <br /> containment berm shall be made of 40 mil Linear Low Density Polyethylene material with <br /> minimum 12"tall aluminum L-Bracket wall supports. <br /> PART 3 EXECUTION <br /> 3.1 OPERATION I <br /> A. Contractor shall be responsible for all costs associated with temporary pumping, including <br /> temporary electric service, temporary standby power, all electricity usage and fuel to operate <br /> the temporary pumps and controls. <br /> B. Respond to and resolve all alarms from temporary pumping operations. Have personnel <br /> available to respond to an alarm within 30 minutes. <br /> C. Ensure temporary bypass pumps are maintained and remain operational 24 hours per day, 7 <br /> days per week for the duration of any planned bypass. <br /> D: Notify Owner immediately in the event of a high level or overflow alarm. Owner will provide <br /> names and telephone numbers of personnel to be contacted in the case of an alarm or other <br /> emergency. <br /> 3.2 STAFFING ' <br /> A. Provide a minimum of one operator for temporary pumping at all times that the pumps are in <br /> operation,unless pumps are automatically controlled in accordance with this Section. <br /> 1 <br /> 3.3 TEMPORARY PIPING <br /> A. Route temporary piping to avoid blocking construction and maintenance equipment access. ' <br /> B. Provide protection for piping and couplings where crossing access points in unavoidable. <br /> Legion Golf Course Stormwater Detention Project Temporary Sewage Control&Bypass Pumping <br /> WO#UP3620 01 57 19.11 -4 <br />