1.5 FUNCTIONAL TESTING <br /> A. Functionally test mechanical and electrical equipment for proper operation after general start- <br /> up and testing tasks have been completed. <br /> ' B. Demonstrate proper rotation, alignment, speed, flow, pressure, vibration, sound level, <br /> adjustments, and calibration. Perform initial checks in the presence of and with the assistance <br /> of the manufacturer's representative. <br /> C. Demonstrate proper operation of each instrument loop function including alarms, local and <br /> remote controls, instrumentation and other equipment functions. Generate signals with test <br /> equipment to simulate operating conditions in each control mode. <br /> ' D. Conduct continuous 8-hour test under full load conditions. Replace parts which operate <br /> improperly. <br /> ' 1.6 CERTIFICATE OF PROPER INSTALLATION <br /> ' A. At completion of functional testing, furnish written report prepared and signed by <br /> manufacturer's authorized representative,certifying equipment: <br /> ' 1. Has been properly installed, aligned, adjusted and lubricated. <br /> 2. Is free of any stresses imposed by connecting piping or anchor bolts. <br /> 3. Is suitable for satisfactory full-time operation under full load conditions. <br /> 4. Operates within the allowable limits for vibration. <br /> ' 5. Controls, protective devices, instrumentation, and control panels furnished as part of the <br /> equipment package are properly installed, calibrated, and functioning. <br /> ' 6. Control logic for start-up, shutdown,sequencing,interlocks,and emergency shutdown has <br /> been tested and is properly functioning. <br /> ' B. Furnish written report prepared and signed by the electrical and/or instrumentation <br /> subcontractor certifying: <br /> ' 1. Motor control logic that resides in motor control centers,control panels,and circuit boards <br /> furnished by the electrical and/or instrumentation subcontractor has been calibrated and <br /> tested and is properly operating. <br /> ' 2. Control logic for equipment start-up, shutdown, sequencing, interlocks and emergency <br /> shutdown has been tested and is properly operating. <br /> C. Co-sign the reports along with the manufacturer's representative and subcontractors. <br /> 1.7 TRAINING OF OWNER'S PERSONNEL <br /> A. Provide operations and maintenance training for items of mechanical, electrical and <br /> instrumentation equipment.Utilize manufacturer's representatives to conduct training sessions. <br /> ' Legion Golf Course Stormwater Detention Project Testing,Training and System Start-Up <br /> WO#UP3620 01 75 16 -3 <br />