My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> B. Coordinate training schedule with City staff. Coordinate training sessions to prevent <br /> overlapping sessions. Arrange sessions so that individual operators and maintenance <br /> technicians do not attend more than two(2) sessions per week. I <br /> C. Provide Operation and Maintenance Manual for specific pieces of equipment or systems two <br /> (2)weeks prior to training session for that piece of equipment or system. <br /> D. Satisfactorily complete functional testing before beginning operator training. <br /> E. The OWNER may videotape the training for later use with the OWNER's personnel. ' <br /> 1.8 OPERATIONAL TESTING <br /> A. Conduct operational test of the entire facility after completion of operator training. <br /> Demonstrate satisfactory operation of equipment and systems in actual operation. <br /> B. Conduct operational test for continuous seven(7)day period. <br /> C. Owner will provide operations personnel, power, fuel, and other consumables for duration of <br /> test. <br /> D. Immediately correct defects in material, workmanship, or equipment which became evident <br /> during operational test. <br /> E. Repeat operational test when malfunctions or deficiencies cause shutdown or partial operation <br /> of the facility or results in performance that is less than specified. , <br /> 1.9 RECORD KEEPING <br /> A. Maintain and submit to ENGINEER the following records generated during start-up and testing , <br /> phase of project: <br /> 1. Daily logs of equipment testing identifying all tests conducted and outcome. i <br /> 2. Logs of time spent by manufacturer's representatives performing services on the job site. <br /> 3. Equipment lubrication records. <br /> 4. Electrical phase, voltage, and amperage measurements. , <br /> 5. Insulation resistance measurements. <br /> 6. Pump torsional and lateral vibration analysis report. I <br /> 7. Data sheets of control loop testing including testing and calibration of instrumentation <br /> devices and set-points. <br /> END OF SECTION <br /> Legion Golf Course Stormwater Detention Project Testing, Training and System Start-Up <br /> WO#UP3620 01 75 16-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.