My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> locations in the field until such time as the replacement of the irrigation heads has been <br /> accomplished. <br /> ' C. Remove the irrigation heads carefully. <br /> D. Cap the remaining risers or swing joints tightly to prevent contamination of the remaining <br /> irrigation system. <br /> E. Upon completion and approval of the Earthwork, coordinate the re-installation or <br /> replacement of the irrigation heads as described in Section 32 80 00-Irrigation Systems. <br /> 3.03 IRRIGATION PIPE: <br /> A. Existing irrigation pipe shall be abandoned in the ground in locations where the pipe does <br /> not conflict with the proposed drainage and irrigation piping work. In areas where <br /> existing irrigation pipe conflicts with proposed piping, the irrigation pipe shall be cut and <br /> removed completely from the site and disposed of properly. Capping of existing <br /> irrigation pipes to remain shall be done according to Section 32 80 00 - Irrigation <br /> Systems. <br /> 3.04 DISPOSE OF ALL NON-SALVAGEABLE WASTE MATERIAL AT AN APPROVED <br /> DISPOSAL FACILITY. <br /> A. All efforts should be made to recycle concrete and asphalt materials. <br /> 3.05 PROTECTION OF FACILITIES: <br /> A. Follow all procedures in Section 01 56 39 for protection of trees and other facilities during <br /> 1 demolition work. <br /> END OF SECTION <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> Legion Golf Course Stormwater Detention Project November 30, 2017 <br /> WO#UP3620 02 41 13.23 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.