My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> disconnect, capping of lines and meter removals required within the Public Rights-of- <br /> Way. <br /> B. The Contractor shall meet with the Engineer to verify location of utilities with the <br /> Contractor's location services. To make arrangements the Contractor shall contact the <br /> Owners Representative to request the meeting and also arrange for underground utility <br /> location services by Everett Plumbing, Electrical, Sewer/Wastewater Shops and <br /> Environmental services staff for locates, site information and to request shut-off of <br /> pressurized or powered utilities. Verify that all appropriate services have been <br /> disconnected. <br /> C. Utility Shutoffs: Coordinate all work with other Division 1 requirements. Do not shut <br /> off or cap utilities without prior notice. Keep streets, sidewalks and site clean and free <br /> from debris at all times. Keep both street and site drainage systems open for free passage <br /> of runoff at all times. Provide siltation control and catch basin protection as required by <br /> Best Managements Practices and Drainage Codes as required and/or directed by the <br /> Engineer. <br /> D. Existing irrigation pipe shall be abandoned in the ground in locations where the pipe does <br /> not conflict with the proposed drainage and irrigation piping Work. In areas where <br /> existing irrigation pipe conflicts with proposed piping, the irrigation pipe shall be cut and <br /> removed completely from the site and disposed of. <br /> E. The disconnection of electrical equipment shall be done by a licensed electrician,prior to <br /> beginning electrical demolition. <br /> F. Existing site storm drains and cath basins, as indicated on the plans or as directed in the <br /> field, shall be kept open and operable at all times. Catch basins shall be protected from <br /> silt by filter fabric insert `sock' during construction, per Section 01 57 13. Catch basins <br /> or pipes that become blocked shall be cleaned immediately by the Contractor. <br /> G. Dispose of all waste material at an approved disposal facility. All efforts should be made <br /> to recycle concrete and asphalt materials. <br /> 3.02 REMOVAL OF EXISTING IRRIGATION HEADS: I <br /> A. Locate all existing irrigation heads within the limits of grading or as otherwise indicated <br /> on the contract drawings by the following means: <br /> 1. Contact the Owners Representative to request a preconstruction Irrigation <br /> Coverage Test for the facility under construction. Note the location of all <br /> operable irrigation heads and their respective Control Zones directly on the <br /> Record Drawings. <br /> 2. At the time of the above mentioned coverage test, and in consultation with the <br /> Engineer, refer to the drawings for locations of irrigation heads that may not be <br /> operating and hence may not have been visible during the test. Locate by hand <br /> digging as necessary. <br /> B. Carefully record the head locations and the remaining risers and swing joints by <br /> surveying their actual locations onto the record drawings. In addition, stake these <br /> Legion Golf Course Stormwater Detention Project November 30, 2017 <br /> WO#UP3620 02 41 13.23 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.