My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> recesses andP rojections with smooth-finish materials,and install in forms with sealed joints to <br /> prevent displacement. <br /> Corner Treatment - Form exposed corners of beams and columns to produce square, smooth, <br /> solid, unbroken lines, except as otherwise indicated. <br /> D. Chamfer exposed corners and edges, reveals and drips as shown using wood, metal, PVC or <br /> rubber strips fabricated to produce uniform smooth lines and tight edge joints. <br /> 111 3.2 PREPARATION OF FORM SURFACES <br /> Coat the contact surfaces of forms with a form-coating compound before reinforcement is placed. <br /> Thin form coating compounds only with thinning agent of type,and in amount,and under conditions <br /> of the form-coating compound manufacturer's directions.Use dissipating type form oil at surfaces to <br /> receive cement plaster finish. Do not allow excess form-coating material to accumulate in the forms <br /> or to come into contact with concrete surfaces against which fresh concrete will be placed. Apply in <br /> compliance with manufacturer's instructions. Coat steel forms with a non-staining,rust-preventative <br /> form oil or otherwise protect against rusting. Rust-stained steel formwork is not acceptable. <br /> 3.3 CONCRETE PLACEMENT <br /> A. Pre-Placement Inspection <br /> 1. Before placing concrete, inspect and complete the formwork installation,reinforcing steel, <br /> and items to be embedded or cast in. Notify other crafts involved in ample time to permit. <br /> the installation of their work; cooperate with other trades in setting such work as required. <br /> Notify ENGINEER in time for inspection prior to pouring. <br /> 2. Thoroughly wet wood forms immediately before placing concrete,as required where form <br /> coatings are not used. <br /> 3. Coordinate the installation of joint materials and moisture barriers with placement of forms <br /> and reinforcing steel. <br /> 4. Concrete Curbs and Paving - Do not place concrete until subbase is completed and <br /> approved by the ENGINEER as required to provide uniform dampened condition at the <br /> time concrete is placed. Moisten subbase as required to provide uniform dampened <br /> condition at the time concrete is placed. <br /> B. Place concrete in compliance with the practices and recommendations of ACI 304 and as herein <br /> specified. <br /> 1. Deposit concrete continuously or in layers of such thickness that no concrete will be placed <br /> on concrete which has hardened sufficiently to cause the formation of seams or planes of <br /> weakness within the section. If a section cannot be placed continuously, provide <br /> construction joints as herein specified.Perform concrete placing at such a rate that concrete, <br /> which is being integrated,with fresh concrete is still plastic. Deposit concrete as nearly as <br /> I <br /> Legion Golf Course Stormwater Detention Project Concrete Work <br /> WO#UP3620 03 11 00 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.