My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2.8 FINISHES <br /> A. Steel: 1 <br /> 1. Clean surfaces of rust, scale, grease, and foreign matter prior to finishing. <br /> 2. Do not prime surfaces in direct contact with concrete or where field welding is required. 1 <br /> 3. Prime-paint items with one coat, except where galvanizing is specified. <br /> a. Primer paint selected must be compatible with the required finish coats of paint. <br /> b. At locations in contact with potable water,use only primer approved for potable water I <br /> use. <br /> 4. Galvanizing for Rolled, Pressed and Forged Steel Shapes, Plates, Bars and Strips: ASTM <br /> A123;hot-dip galvanize after fabrication. <br /> 5. Galvanizing for Fasteners, Connectors, and Anchors: <br /> a. Hot-Dip Galvanizing: ASTM A153. <br /> b. Mechanical Galvanizing: ASTM B695; Class 50 minimum. I <br /> 6. Chrome Plating: ASTM B177,nickel-chromium alloy,polished finish. <br /> 7. Sheet Steel: Galvanized. <br /> 8. Bolts: Hot-dip galvanized. <br /> 9. Nuts: Hot-dip galvanized. <br /> 10. Washers: Hot-dip galvanized. r' <br /> 11. Touchup Primer for Galvanized Surfaces:ASTM A780(A780M),Al. Repair Using Zinc- <br /> Based Alloys (Heat and Stick Method). I <br /> B. Stainless Steel: <br /> 1. Satin-Polished Finish: Number 4, satin directional polish parallel with long dimension of , <br /> finished face. <br /> 2. Mirror-Polished Finish: Number 8, mirror polish with preliminary directional polish lines <br /> removed. <br /> C. Aluminum: I <br /> 1. Protection of All Aluminum: <br /> a. Aluminum surfaces in contact with cementitious, masonry or dissimilar materials, <br /> apply the following coating system: <br /> I <br /> Legion Golf Course Stormwater Detention Project Metal Fabrications 1 <br /> WO#UP3620 05 50 00- 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.