My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1) One(1)coat of epoxy primer, 1 to 2 mils dry film(D.F.). <br /> 2) Followed by two(2)coats of Bitumastic, 6 to 8 mils D.F. <br /> 3) Followed by two (2)coats of tarset material, 6 to 8 mils D.F. <br /> D. Shop Painting <br /> 1. Shop painting of metal fabrications shall be allowed only at the sole discretion of the <br /> Engineer. <br /> 2. Remove scale,rust and other deleterious materials before the shop coat of paint is applied. <br /> a. Clean off heavy rust and loose mill scale in accordance with SSPC SP-7, Brush-off <br /> Blast Cleaning. <br /> b. Remove oil, grease and similar contaminates in accordance with SSPC SP-1, Solvent <br /> ICleaning. <br /> 3. Immediately following surface preparation, brush or spray on metal primer paint, applied <br /> in accordance with the manufacturer's instructions or as specified below. <br /> 4. Apply one(1) shop coat of metal primer paint to fabricated metal items, except apply two <br /> (2)coats of paint to surfaces which will be inaccessible after assembly or erection. Change <br /> color of second coat to distinguish it from the first. <br /> E. Touch-up Painting,Pre-painted Items: <br /> 1. Immediately after erection, clean field welds,bolted connections,and abraded areas of the <br /> shop paint, and paint all exposed areas with the same material as used for shop painting. <br /> 2. Apply touch-up coatings by brush or spray to provide a minimum dry film thickness of the <br /> original coating thickness. <br /> I <br /> PART 3 EXECUTION <br /> • <br /> 3.1 EXAMINATION <br /> A. Verify that field conditions are acceptable and are ready to receive Work. <br /> 3.2 PREPARATION <br /> A. Clean and strip primed steel items to bare metal and aluminum where Site welding is required. <br /> B. Furnish setting drawings, diagrams, templates, instructions and directions for the installation <br /> of anchorages, such as concrete inserts, anchor bolts and miscellaneous items having integral <br /> anchors. Supply steel items required to be cast into concrete or embedded in masonry with <br /> setting templates to appropriate sections. Coordinate delivery of such items to the project Site. <br /> 3.3 INSTALLATION <br /> A. Install items plumb and level,accurately fitted, and free from distortion or defects. <br /> Legion Golf Course Stormwater Detention Project Metal Fabrications <br /> WO#UP3620 05 50 00 - 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.