I <br /> provided with a Bill of Materials showing quantity,manufacturer's name, catalog number, <br /> and supplier name and phone number. <br /> F. Certify on all submittals that the material being proposed conforms to the contract <br /> requirements. In the event of any variance, state specifically which portions vary and <br /> request a variance in writing. <br /> G. Certify that all furnished equipment is able to be installed in the allocated spaces by stating on <br /> 1 each item: <br /> H. "This equipment will be able to be installed in the spaces allocated." <br /> I. Shop Drawings shall be provided on 11"x 17"sheets maximum size,and shall be scaled using <br /> standard engineering or architectural scales. Wiring diagrams shall identify circuit <br /> terminals, and indicate the internal wiring for each item of equipment and the <br /> interconnection between each item of equipment. <br /> J. The Engineer will review the original submittal and one resubmittal on each item. Subsequent <br /> submittal reviews shall be conducted at the Contractor's expense. The Contractor shall be <br /> billed at the Engineer's current hourly rates. <br /> K. Selective Coordination: For legally required standby power systems the contactor shall provide <br /> a selectively coordinated power system of fuses or breakers. The design on the plans may <br /> be altered if submitted with documentation that shows that the system is selectively <br /> Icoordinated. <br /> 1.10 STORAGE AND INSTALLATION ENVIRONMENT: <br /> A. All electrical equipment shall be stored in a dry environment free from dust, moisture, sprays <br /> or vapors, which may be detrimental to their new condition. After installation of <br /> equipment, care shall be taken to protect all equipment from all dust, moisture, paint and <br /> other spray, harmful vapors, etc. until final acceptance and certificates of occupancy have <br /> been obtained. <br /> ' B. Equipment shall not be installed in indoor areas until the area is covered, dry and finished to <br /> the point that other work will not create dust,vapors,or moisture. Equipment with integral <br /> heaters and fans shall not be installed until power is available at the location and the heater <br /> Iand fan shall be energized within 6 hours of the equipment being installed. <br /> 1.11 CLEANUP: <br /> A. The premises must be kept free of accumulated materials, rubbish and debris at all times. <br /> Surplus material,tools and equipment must not be stored at the job site. At the completion <br /> of the job, all equipment and fixtures shall be left clean and in proper condition for their <br /> intended use. <br /> t <br /> END OF SECTION <br /> Legion Golf Course Stormwater Detention Project Electrical General <br /> WO#UP3620 26 00 00- 5 <br />