Laserfiche WebLink
I <br /> DOCUMENT 31 00 00 EARTHWORK <br /> PART 1-GENERAL <br /> ' 1.01 Description: Provide all labor, materials, and equipment to perform the following work of the <br /> Contract, including incidentals related to that work and coordination and support of other work <br /> specified elsewhere in the Contract Documents: <br /> A. Safety Monitoring&Response. <br /> B. Protection of Existing Features and Work in Progress. <br /> C. Survey for horizontal and vertical control of all work of the Contract. <br /> D. Grading and compaction as required achieving lines and grades on Drawings. <br /> E. Excavation and backfill of trenches for Utilities, including; Irrigation Systems, Potable <br /> Water Systems, Storm/Sub-surface Drainage Systems, Sanitary Sewer Systems and <br /> Electrical Conduit to lines and grades as shown on the Drawings. <br /> F. Grading & Compaction of sub-grade and base aggregates for Concrete, Concrete <br /> Masonry Unit and Asphalt Paving. <br /> G. Import and placement of Planting Soils for grass Areas and Landscape Plantings. <br /> H. Placement and compaction of Structural Soils for Pre-cast Turf Reinforcement. <br /> I. Removing materials from the site which are in excess of that which is required. <br /> J. Coordinate Earthwork operations for Walls, Abutments, Footings, Building Foundations <br /> and other work associated with the project. <br /> 1.02 QUALITY ASSURANCE: <br /> A. The Contractor is responsible for verifying the quality of the work and shall perform <br /> compaction and density tests on request of the Engineer to check compliance with these <br /> specifications. A copy of the test reports shall be furnished to the Engineer. <br /> B. The Engineer's Testing Agency may perform compaction and density tests to verify <br /> compliance with these specifications. <br /> C. The Engineer may require that an independent testing laboratory test imported materials <br /> at any time. If the material is found to be non-compliant with the Contract, the <br /> Contractor shall bear the cost of testing, removal of all non-compliant materials from the <br /> 1 Project Site, and replacement of the materials with materials meeting the requirements of <br /> the Contract. If the materials tested are found to be compliant with the requirements of <br /> the Contract, the Owner will reimburse the Contractor for costs incurred by testing plus <br /> mark-ups as allowed for elsewhere in the Contract. <br /> D. It is the responsibility of the Contractor to verify the accuracy of all survey information <br /> ' provided by the Owner prior to commencing excavations or filling operations. <br /> Commencement of these operations constitutes acceptance of the survey information as <br /> appropriate to meet the intent of the Contract. <br /> E. Submittals: <br /> 1. Safety Products: <br /> a. Submit for the Engineer's approval manufacturers product data for each <br /> worker safety product specified. <br /> I <br /> Legion Golf Course Stormwater Detention Project December 1, 2017 <br /> WO#UP3620 31 00 00- 1 <br />