Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> b. Provide current calibration certificates for each piece of mechanical i <br /> monitoring equipment to be used in the work. Perform field testing of <br /> equipment for the Engineers approval prior to commencing excavation. <br /> 2. Bulk Materials: The Engineer shall approve in principle all products used in the <br /> execution of this section prior to their importation to the Project Site. Submit a <br /> particle gradation analysis in graph and table form for each product specified. <br /> Approval of the Engineer of an analysis does not constitute approval of the actual <br /> product, which may be subject to additional testing at any time per paragraph <br /> 1.04.0 above. I <br /> 1.04 EXISTING CONDITIONS: Documentation regarding existing conditions, in addition to the <br /> current survey supplied in the Contract Drawings, includes the following; <br /> A. Project Site Record Drawings: Record drawings are attached in the appendices. The <br /> record drawings may not be accurate, Contractor should field verify to confirm as aspects <br /> of record drawings. <br /> B. Geotechnical and Soils Reports: Report is attached in the appendices. <br /> C. Other Available Information: Other information regarding utilities belonging to 111 <br /> jurisdictions other than the Owner may be obtained through direct contact with those <br /> agencies. I <br /> 1.05 MANUFACTURER'S QUALIFICATIONS: The Contractor shall cause the materials that are to <br /> be furnished under this section to be the product of firms that are regularly engaged in the <br /> manufacture of the specified materials. <br /> PART 2 -PRODUCTS I <br /> 2.01 GENERAL: <br /> A. Prior to the importation of any materials,the Contractor shall provide the Engineer with a <br /> certified test lab report of the sieve analysis of each aggregate product. The Engineer <br /> shall be the final determining factor in establishing compliance with sieve requirements. I <br /> No material shall be brought onto the job site until the initial sieve analysis has been <br /> approved in writing by the Engineer. <br /> B. During the course of importation of materials, the Contractor shall be responsible for <br /> continually checking the materials to insure that they continue to meet the Specifications. <br /> 2.02 SAFETY, MONITORING, &RESPONSE PRODUCTS AND EQUIPMENT: <br /> A. The Contractor shall provide barricades, safety guards, temporary fencing, signage and/or <br /> other methods to secure trenches, open excavations, and other unsafe conditions resulting <br /> from this construction. Undertake work in full compliance with all applicable regulatory <br /> requirements. <br /> 2.03 STORM DRAINAGE BACKFILL: 111 <br /> A. Perforated Drain Pipe(Non-rigid PVC Pipe): I <br /> Legion Golf Course Stormwater Detention Project December 1, 2017 <br /> WO#UP3620 31 00 00-2 <br />