My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Sieve Size Percent Passing <br /> I <br /> No. 6 sieve 95-100 <br /> No. 8 sieve 85-95 <br /> No. 50 sieve 15-30 <br /> No. 200 sieve 0-2 <br /> B. Suitable backfill material for use around all conduit,hand holes and equipment as shown on <br /> the drawings, shall be native topsoil with no rocks or other debris more than 1/2 inch <br /> diameter or Pea Gravel or`Builders" Sand. Provide proper screening of materials prior to <br /> backfilling. I <br /> C. Electrical conduit trench backfill shall comply with Section 26 00 00 -Electrical. <br /> 2.06 PAVEMENT BASE AGGREGATE: For use as imported base course for Concrete,Asphalt, and I <br /> Concrete Masonry Unit Paving; <br /> A. Shall be Type 1 Mineral Aggregate (5/8" minus crushed rock), bearing no naturally <br /> I <br /> occurring or worn surfaces, per City of Everett Standard Specifications (most recent <br /> edition) and/or Section 32 11 23 - Mineral Aggregates. Gradation of the base course Ilshall be: <br /> Sieve Size Percent Passing <br /> 5/8"square sieve 100 <br /> 1/4" square sieve 55 -75 <br /> No. 40 sieve 8-24 <br /> No. 200 sieve wet 10.0 maximum wet <br /> 2.07 SELECTED BACKFILL (COMMON FILL): Where on-site soils prove to be insufficient in I <br /> quantity or quality to achieve design sub-grades and compaction levels, imported fills may be <br /> accepted upon approval of the Engineer. Selected Backfill (Common Fill) shall be Type 17 <br /> (Bank Run Gravel), available from a recognized commercial source meeting the following sieve <br /> gradation, per the City of Everett Standard Specifications (most recent edition) and/or Section 32 <br /> 11 23 -Mineral Aggregates. <br /> Sieve Size Percent Passing <br /> 3" square sieve . 95 - 100 <br /> 1/4"square sieve 25 -75 <br /> No. 200 sieve wet 0-5 <br /> A. Organic content shall be no greater than 8%dry weight. I <br /> B. Variations to this particle gradation may be considered dependant on the application. <br /> C. Submit to the Engineer a written request to import Selected Backfill (Common Fill) I <br /> including the total volume of import anticipated (or range) and the source including <br /> name, address, and phone number of supplier, and geographic source of the material <br /> proposed to be imported. <br /> 2.08 UTILITY PIPE TRACER TAPE: Shall be detectable below ground surface and color coded, <br /> with utility name printed on the tape. Conductive Warning Tape is required over all water, sewer, III <br /> drainage, irrigation pipe and electrical conduit. Tape shall be manufacturer's standard permanent, <br /> bright-colored, continuous printed plastic tape, aluminum backed, intended for direct-burial <br /> service. Tape shall be not less than 3"wide x 4 mils thick. I <br /> Legion Golf Course Stormwater Detention Project December 1, 2017 <br /> WO#UP3620 310000-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.