My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tape Schedule: Piping Color Wording <br /> Sanitary Sewer Green Caution-Sanitary Sewer <br /> Storm Drain Green Caution-Storm Drain <br /> Irrigation Systems Blue Caution-Irrigation <br /> Domestic Water Blue Caution- Water <br /> Electrical Conduit Red Caution-Electrical <br /> PART 3-EXECUTION <br /> 3.01 SAFETY MONITORING & RESPONSE: In addition to all current State and Local Safety <br /> ' Requirements; <br /> A. Maintain conformance to the Contractors Health and Safety Plan. <br /> B. When working in the presence of landfill materials (exposed refuse), the Contractor shall <br /> conform to all appropriate WAC codes and practices. <br /> 3.02 PROTECTION OF EXISTING FACILITIES: <br /> A. Refer to Division 1 Specifications, for information pertinent to the protection of all <br /> existing facilities. <br /> B. It is understood that there will be interfering utilities, service laterals and other <br /> underground pipes, drains or structures encountered that are not shown, or areas shown <br /> incorrectly on the plans, or have not been previously discovered in the field. Contractor <br /> agrees this is a normal and usual occurrence in the construction of underground <br /> improvements. Furthermore, Contractor understands and agrees that work in some cases <br /> ' must be done in close proximity to said utilities and underground pipes, drains and <br /> structures not shown or shown incorrectly on the plans, which may require a change in <br /> operations and may cause sloughing of the trench, additional traffic control, additional <br /> pavement and backfill costs and time. The Contractor agrees that these occurrences are <br /> usual and ordinary, and are reflected in the bid and plan of operation. <br /> C. Contractor agrees to provide for these conflicts and interferences and agrees to provide for a <br /> reasonable amount of time for design changes and/or utility relocations due to said <br /> interferences. <br /> D. Repair and or replacement of damaged facilities to the Engineer's satisfaction, will be <br /> accomplished at the Contractor's expense. <br /> 3.03 PROTECTION OF WORK IN PROGRESS: It is the responsibility of the Contractor to protect <br /> all work in progress from damage due to extremes of cold, moisture, or drying, or mechanical <br /> damage from equipment traffic or foot traffic. Alert the Engineer to the presence or likelihood of <br /> conditions that may adversely affect the quality of the work, the physical structure of soils, or <br /> transport of site soils off-site. <br /> A. Do not work frozen soils. <br /> B. Protect soils from excessive moisture. During periods of prolonged precipitation, take <br /> aggressive steps to avoid over-saturation, erosion, or homogenization of soils by covering <br /> with protective plastic sheeting, collection and controlled dewatering, detention for <br /> Legion Golf Course Stormwater Detention Project December 1, 2017 <br /> WO#UP3620 31 00 00- 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.