My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sediment removal, and allowing excessively wetted soils to remain fallow until approved , <br /> by the Engineer as appropriate for continued work. It shall be the Contractor's sole <br /> responsibility for soils that are contaminated by the weather and/or by his/her <br /> construction activities. <br /> C. Apply supplemental moisture to overly dry soils. <br /> D. Do not operate heavy equipment near excavations where trench wall or cut-slope failure <br /> may result. <br /> 3.04 EARTHWORK-GENERAL: I <br /> A. Removal of materials beyond indicated sub-grade elevations or dimensions without <br /> specific direction of the Engineer is not authorized. Unauthorized excavation, as well as <br /> remedial work directed by the Engineer, shall be at the Contractor's expense. <br /> B. Stability of excavations: 1 <br /> 1. Sides of excavations to be vertical as shown on the Drawings. Maintain sides of <br /> excavations in a clean and safe condition until completion of back filling. <br /> 2. Shoring and bracing are required at excavations deeper than 4 feet below <br /> adjacent existing grade. All shoring and bracing shall conform to the <br /> requirements of the Everett Standard Specifications (most recent edition) and <br /> requirements of the Washington Industrial Safety and Health Act. <br /> C. Dewatering: Prevent surface and subsurface water from flowing into excavations and <br /> from flooding project site. Establish and maintain temporary drainage ditches and other <br /> diversions outside excavation limits to convey rain water and water removed from <br /> excavations to collecting or run-off areas. If required, line ditches and sumps with <br /> coarse-grained material that acts as a filter. Do not use trench excavations as temporary <br /> drainage ditches. All dewatering shall conform to the requirements of the City of Everett <br /> Standard Specifications (most recent edition) and Title 22.802 of the City of Everett <br /> Stormwater,Grading, and Drainage Control Code(most recent edition). <br /> D. Material Storage: Stockpile satisfactory excavated materials where directed, until <br /> required for backfill or fill. Place, grade,and shape all stockpiles for proper drainage. , <br /> E. Locate and retain soil materials away from edge of excavations and drip lines of trees to <br /> remain. I <br /> F. Dispose of excess soil material and waste materials as herein specified. <br /> 3.05 GRADING: ' <br /> A. Uniformly grade areas within limits of grading under this section, including adjacent <br /> transition areas. Smooth finished surface within specified areas. Smooth finished surface <br /> within specified tolerances, compact with uniform levels or slopes between points where <br /> elevations are shown, or between such points and existing grades. Finish surfaces free <br /> from irregular surface changes. <br /> A. Landscape planting, lawns, and other landscape repair areas finish grade to be minus 1/2 <br /> inch from adjacent paving surfaces with smooth transition to adjacent grades. I <br /> Legion Golf Course Stormwater Detention Project December 1, 2017 <br /> WO#UP3620 310000-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.