My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> SECTION 31 10 00 - SITE CLEARING <br /> PART 1 GENERAL <br /> 1.1 SUMMARY <br /> A. This Section includes clearing site of incidental paving and curbs, debris,grass,trees, and <br /> ' other plant life in preparation for site or building excavation work. <br /> 1.2 DEFINITIONS <br /> A. Clearing:Removal of interfering or objectionable material lying on or protruding above <br /> ground surface. <br /> B. Grubbing: Removal of vegetation and other organic matter including stumps,buried logs, and <br /> roots greater than 2-inch caliper to a depth of 12 inches below subgrade. <br /> C. Interfering or Objectionable Material: Trash,rubbish, and junk;vegetation and other organic <br /> matter,whether alive, dead, or decaying;topsoil. <br /> D. Limits of Disturbance: Work area boundary as shown on the Plans. <br /> E. Root Wad: Tree stump and root mass including all roots greater than 1-inch diameter. <br /> F. Stripping: Removal of topsoil remaining after applicable scalping is completed. <br /> 1.3 SUBMITTALS <br /> A. Section 01 33 00- Submittal Procedures: Requirements for submittals. <br /> B. Clearing, Grubbing and Stripping Plan: Drawings clearly showing proposed limits to <br /> clearing, grubbing and stripping activities at Site. <br /> C. Certification or disposal permit for landfill and/or waste disposal site. <br /> D. A copy of written permission of private property owners,with copy of fill permit for said <br /> private property, as may be required for disposal of materials. <br /> 1.4 QUALITY ASSURANCE <br /> A. Existing Conditions: Determine the extent of Work required and limitations before <br /> proceeding with Work. <br /> B. Obtain Engineer's approval of staked clearing, grubbing, and stripping limits prior to <br /> commencing clearing, grubbing, and stripping. <br /> C. Conform to applicable local, state and federal codes for environmental requirements and <br /> ' disposal of debris, <br /> 1. Burning on project site will not be permitted. <br /> Legion Golf Course Stormwater Detention Project Site Clearing <br /> WO#UP3620 31 10 00- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.