My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1. Asphalt,concrete, and gravel surfaces designated for removal shall be done to full depth. <br /> 2. Asphalt, concrete, and gravel removed at Site may be reused at Site where shown in the <br /> Drawings or following approval of the Engineer. <br /> 3. Haul removed asphalt, concrete, and gravel which is unsuitable for reuse or that exceeds <br /> quantity required. <br /> C. Remove debris,rock, abandoned piping and extracted plant life from Site. <br /> D. Remove from the Site all debris,materials, equipment and items found thereon and materials <br /> and debris resulting from the Work, except as otherwise indicated. <br /> ior specified 1. All existing improvements designated on the Drawings spec fed to be removed <br /> including but not limited to structures, pipelines, walls, footings, foundations, slabs, <br /> pavements, curbs, fencing and similar structures occurring above, at, or below existing <br /> ground surface shall be included in the Work. <br /> 2 Unless otherwise specified, any resulting voids shall be thoroughly cracked out for <br /> drainage and backfilled with suitable excavated or imported material compacted to the <br /> density of the adjacent soil. <br /> E. Continuously clean-up and remove waste materials from site. Do not allow materials to <br /> accumulate on site. <br /> F. Do not burn or bury materials on site. Leave site in clean condition. <br /> G. Removal: All material resulting from demolition, clearing and grubbing, and trimming <br /> operations shall be removed from the Site and disposed of in a lawful manner. Materials <br /> placed on property of private property owners shall be by written permission only. <br /> H. Cleanup: During and upon completion of work, promptly remove all unused tools and <br /> equipment, surplus materials and debris. <br /> I. Adjacent areas shall be returned to their existing condition prior to the start ofWork. j <br /> 3.9 CLEANUP <br /> A. Duringthe time Work is in progress, make everyeffort to maintain the Site in a neat and <br /> P g <br /> orderly condition. <br /> B. All refuse, broken pipe, excess fill material, cribbing and debris shall be removed as soon as <br /> practicable. <br /> C. Should the Work not be maintained in a satisfactory condition, the Owner may cause the <br /> work to stop until the cleanup of the Work has been done to the satisfaction of the Engineer. <br /> D. The Work will not be considered complete or the final payment certificate issued until all <br /> rubbish, unused material, or equipment shall have been removed and the premises left in a <br /> condition satisfactory to the Owner and the Engineer. <br /> Legion Golf Course Stormwater Detention Project Site Clearing <br /> WO#UP3620 31 10 00 -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.