My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
文档关系
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
路径:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
路径:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
路径:
\Documents\City Clerk\Contracts\Capital Contract
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 5. Roadways: Clearing, grubbing, scalping,and stripping 5 feet from roadway shoulders. <br /> 6. Other Areas: As shown. <br /> B. Remove rubbish,trash,and junk from entire area within the Limits of Disturbance as material <br /> is generated. Stockpiling shall not be permitted without written approval of Owner. <br /> 3.6 CLEARING AND GRUBBING <br /> A. Clear and grub areas within limits shown in approved Clearing,Grubbing and Stripping Plan. <br /> B. Except in areas to be excavated, all holes resulting from the clearing and grubbing operations <br /> shall be backfilled and compacted in accordance with the applicable sections of these <br /> Specifications. <br /> C. Clearing: <br /> 1. Remove trees, saplings, snags, stumps, shrubs, brush, vines, grasses, weeds and other <br /> vegetative growth within the clearing limits shown in the Drawings, except those trees <br /> and shrubs noted to remain in the Drawings or as directed by the Engineer. <br /> 2. Clearing shall be performed in such a manner as to remove all evidence of the presence <br /> of vegetative growth from the surface of the project site and shall be inclusive of sticks <br /> and branches of thickness or diameter greater than 3/8-inch and of grasses, weeds, <br /> exceeding 12 inches in height except as otherwise indicated. <br /> 3. Clear undergrowth and deadwood,without disturbing subsoil. <br /> D. Grubbing: Clear areas required for access to site and execution of Work and remove all <br /> stumps,root wads, and roots over 1-inch diameter to the following depths: <br /> 1. Future Structures and Building Areas 24 Inches <br /> 2. Roads and Parking Areas 18 Inches <br /> 3. All other Areas 12 Inches <br /> 3.7 TREE REMOVAL <br /> A. Exercise care in cutting, felling, trimming, and handling of those trees shown for removal to <br /> prevent damage to neighboring trees and structures to remain. <br /> B. Tree Salvage: As shown on the Plans. <br /> C. No trees may be removed unless approved and permitted by the Engineer. <br /> D. Do not top trees unless otherwise specified or approved by Owner in writing. <br /> 3.8 REMOVAL AND DISPOSAL <br /> A. Native vegetation may be mulched and used on Site. <br /> SB. Asphalt and Gravel Surfaces: <br /> Legion Golf Course Stormwater Detention Project Site Clearing <br /> WO#UP3620 31 10 00 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.