My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> a. Allow forforms,shoring,working space,granular base,topsoil and similar items,wherever <br /> applicable. <br /> b. Trim excavations to neat lines. Remove loose matter and lumped subsoil. <br /> E. Excavated Materials: Soils excavated at Site will be treated and used as one of two <br /> general categories of material as provided below. <br /> a. Fill: I <br /> a. Subsoil Type S l, Select Native Fill, as approved for use by Engineer. <br /> b. Spoils: <br /> a. Ensure there is sufficient suitable material available to complete embankments and 111 <br /> other required fillings prior to disposing of any excavated materials. <br /> b. Make arrangements for disposal of spoils and include as part of contract work in 1 <br /> preparing of project bids. <br /> c. Landfill permit or written permission from private property owner to be obtained by <br /> the Contractor and provided to the Engineer. <br /> F. Shoring: 1 <br /> 1. As specified in Section 31 50 00, Excavation Support Systems. I <br /> G. Slope existing banks with machine to angle of repose or less until shored. <br /> 1. Shape, trim, and finish cut slopes to conform to lines, grades, and cross-sections shown, <br /> with proper allowance for topsoil or slope protection,where shown. <br /> 2. Protection of excavation side slopes: <br /> i. Use excavation methods that will not shatter or loosen excavation slopes. <br /> ii. Where practical, excavate materials without previous loosening and in limited <br /> layers or thickness to avoid breaking the material back of the established slope line. <br /> iii. Avoid overbreaks. Overbreak is incidental to the Work, except in cases where the <br /> Owner's Representative determines that such overbreak was unavoidable. <br /> iv. Excavation in rock or rocky cuts: <br /> 1) Once completed, thoroughly test the slopes with bars or other approved means to <br /> remove all loose, detached,broken,or otherwise unstable material. <br /> Legion Golf Course Stormwater Detention Project Excavation I <br /> WO#UP3620 31 23 16 - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.