Laserfiche WebLink
I <br /> L. Stockpile excavated material in area(s)designated on or off site in accordance with Section 31 <br /> 05 13, Soils for Earthwork. <br /> 3.6 FIELD QUALITY CONTROL <br /> A. Perform excavation and controlled fill operations in accordance with the requirements of this I <br /> Section. <br /> B. Coordinate the visual inspection and approval of all bearing surfaces by Engineer before I <br /> installing subsequent work. <br /> 3.7 PROTECTION I <br /> A. Prevent displacement or loose soil from falling into excavation;maintain soil stability and store <br /> excavated materials at a distance from top of excavation. <br /> B. Protect structures, utilities and other facilities from damage caused by settlement, lateral <br /> movement,undermining,washout, and other hazards created by earth operations. <br /> 111 <br /> END OF SECTION <br /> I <br /> • <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> Legion Golf Course Stormwater Detention Project Excavation I <br /> WO#UP3620 31 23 16- 8 <br />