My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SECTION 31 23 17 -TRENCHING <br /> PART 1 GENERAL <br /> 1.1 SUMMARY <br /> A. This Section includes the requirements for excavation and backfill of all utilities, including <br /> installation of pipe bedding,pipe zone backfill, and trench backfill and related Work as <br /> shown on the Drawings and as specified. <br /> B. Section includes: <br /> 1. Excavating trenches for pipe,utility vaults and other utilities. <br /> 2. Compacted fill from top of utility bedding to final grades. <br /> 3. Trench and utility vault backfilling and compaction. <br /> C. Related Sections <br /> 1. Supplemental Information: Geotechnical report;bore hole locations and findings of <br /> subsurface materials. <br /> 1.2 REFERENCES <br /> A. American Association of State Highway and Transportation Officials: <br /> 1. AASHTO T99- Standard Specification for Moisture-Density Relations of Soils Using a <br /> 2.5-kg(5.5-1b)Rammer and a 305-mm(12-in.)Drop. <br /> B. ASTM International: <br /> I1. ASTM C403 - Standard Test Method for Time of Setting of Concrete Mixtures by <br /> Penetration Resistance. <br /> 2. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil <br /> Using Standard Effort(12,400 ft-lbf/ft3 (600 kN-m/m3)). <br /> 3. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in Place by <br /> Nuclear Methods (Shallow Depth). <br /> 4. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by <br /> Nuclear Methods (Shallow Depth). <br /> 5. D4832, Standard Test Method for Preparation and Testing of Controlled Low Strength <br /> Material(CLSM)Test Cylinders. <br /> 1.3 DEFINITIONS <br /> A. Controlled Low Strength Material (CLSM): Also referred to as Flowable Fill. Lean cement <br /> concrete fill. A self-compacting, cementitious material. <br /> I <br /> Legion Golf Course Stormwater Detention Project Trenching <br /> WO#UP3620 31 23 17 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.