My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> L. Prepared Trench Bottom: The bottom of the trench on which the pipe bedding is to lie and <br /> which provides support for the pipe. <br /> M. Relative Compaction: Ratio, in percent, of as-compacted field dry density to laboratory <br /> maximum dry density as determined in accordance with ASTM Standards. <br /> N. Rigid Pipe: For the purposes of these Specifications,pipe constructed of PVC,ductile iron, <br /> steel, concrete and clay pipes are considered rigid pipes. <br /> O. Sewer,Pipes, and Mains: Conduits of circular or other geometric shapes, used to convey <br /> liquids or gases,or other material. <br /> P. Trench Backfill: Trench backfill zone for full trench width extending from the top of the pipe <br /> zone to pavement base rock, ground surface or other surface material. <br /> Q. Trench Stabilization: Removal of unsuitable material in the bottom of a trench and <br /> replacement with specified material for support of a pipe,main, conduit, structure, or <br /> appurtenances. <br /> R. Utility: Any buried pipe, duct, conduit, or cable. <br /> S. Well-Graded: A mixture of particle sizes with no specific concentration or lack thereof of one <br /> or more sizes that, when compacted,produces a strong and relatively incompressible soil <br /> mass free from detrimental voids. <br /> 1.4 SUBMITTALS <br /> A. Section 01 33 00, Submittal Procedures: Requirements for submittals. <br /> B. Excavation support plan and utility protection plan as specified in Section 31 50 00, <br /> Excavation Support Systems <br /> C. Product Data: <br /> 1. Geotextile fabric, indicating fabric and construction. • <br /> 111 2. Marking tapes; <br /> 3. Tracer wire; <br /> 4. Connectors for tracer wire and/or marking tapes; <br /> 5. Tracer wire locate boxes; <br /> 6. Marker balls; <br /> 7. Locator stations; <br /> 8. Ground wires; <br /> 9. Plastic or copper markers for service laterals. <br /> D. Imported Materials: <br /> 1. Materials Source: Submit name and location of imported fill materials suppliers. <br /> ' 2. Manufacturer's Certificate: Certify Products meet or exceed specified requirements. <br /> 3. Submit results of aggregate sieve analysis and standard proctor test for granular material. <br /> Legion Golf Course Stormwater Detention Project Trenching <br /> WO#UP3620 31 23 17 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.