My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> E. CLSM: Mix designs in accordance with Submittal requirements of Section 31 23 24, <br /> Flowable Fill. <br /> F. Concrete: Mix designs in accordance with Submittal requirements of Section 03 11 00, <br /> Concrete Work <br /> 1.5 QUALITY ASSURANCE I <br /> A. Subsoil and topsoil fill materials: In accordance with Quality Assurance requirements stated <br /> in Section 31 05 13, Soils for Earthwork. <br /> B. Aggregate fill materials: In accordance with Quality Assurance requirements stated in Section <br /> 31 05 16,Aggregates for Earthwork. I <br /> C. CLSM: <br /> 1. In-place testing: In accordance with ASTM C403. I <br /> 2. Compressive testing: In accordance with ASTM D4832. <br /> D. Allowable Tolerances: Final grades shall be plus or minus 0.1-foot. <br /> 1.6 QUALIFICATIONS <br /> A. Special minimum experience qualifications apply to the installation of water mains for this <br /> project. The Water Main Contractor must be qualified by the Engineer prior to bidding. A <br /> Statement of Qualifications Form shall be submitted to the Engineer for review and approval I <br /> by those prospective water main contractors not already listed as prequalified contractors in <br /> Section 00 21 13,Instructions to Bidders. Refer to Section 00 21 13,Instructions to Bidders <br /> and Section 00 20 50,Water Main Contractor Statement of Qualifications Form for <br /> prequalification information. <br /> 1.7 COORDINATION <br /> A. Verify Work associated with lower elevation utilities is complete before placing higher <br /> elevation utilities. <br /> B. Coordinate trenching and utility installation work with other work at utility construction <br /> location occuring near or adjacent to specified herein. <br /> 1 <br /> PART 2 PRODUCTS <br /> 2.1 FILL MATERIALS I <br /> A. Subsoil Fill: Type S 1, Select Native Material as specified in Section 31 05 13, Soils for <br /> Earthwork. <br /> B. Imported Granular Fill: Coarse Aggregate Type Al,Dense-Graded Aggregate with gradation <br /> as shown in the Drawings and specified in Section 31 05 16, Aggregates for Earthwork. I <br /> C. Concrete: <br /> I <br /> Legion Golf Course Stormwater Detention Project Trenching I <br /> WO#UP3620 31 23 17 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.