My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> C. Drawings and/or specifications cover and govern replacement and restoration of foreseeable <br /> damage. <br /> D. The site of an open cut excavation shall be first cleared of all obstructions preparatory to <br /> excavation in accordance with Section 31 10 00, Site Clearing. <br /> E. See Section 31 10 00, Site Clearing for additional requirements in protection of existing <br /> utilities, survey control,plant life and landscaped areas in coordination with Work in this <br /> Section. <br /> 1. Intent of Drawings and Specifications is that all streets, structures, and utilities be left in <br /> condition equal to or better than original condition. <br /> 2. Where damage occurs, and cannot be repaired or replaced,the Contractor shall purchase <br /> and install new material,which is satisfactory to Owner. <br /> F. Potholing/Exploratory Test Pits: Dig such exploratory test pits and perform potholing as <br /> may be necessary in advance of trenching to determine the exact location and elevation of <br /> subsurface structures,pipelines, duct banks, conduits,and other obstructions which are likely <br /> to be encountered or need to be connected to and shall make acceptable provision for their <br /> protection, support,and maintenance of their continued operation. <br /> G. Paved or Surfaced Streets: <br /> 1. Wherever paved or surfaced streets are cut,saw wheel or approved cutting devices shall <br /> be used. <br /> 2. Width of pavement cut shall be as shown in the Drawings. <br /> 3. Any cut or broken pavement shall be removed from site during excavation. <br /> H. Traffic: <br /> 1. Maintain street traffic at all times as required by the Drawings and as specified herein. <br /> 2. Erect and maintain barricades,warning signs,traffic cones, and other safety devices <br /> during construction in accordance with the latest edition of Manual of Uniform Traffic <br /> Control Devices(MUTCD),Part 6, to protect the traveling public in any area applicable. <br /> 3. Provide flaggers as required during active work in roadway areas. <br /> I. Operations shall be confined to rights-of-way and easements provided. Avoid encroachment <br /> on, or damage to,private property or existing utilities unless prior arrangements have been <br /> made with copy of said arrangement submitted to Engineer. <br /> 3.2 EASEMENTS <br /> A. Where portions of the Work are located on private property, easements and permits will be <br /> obtained by the Owner. Easements shall provide for the use of property for construction <br /> purposes to the extent indicated on the easements. <br /> I <br /> Legion Golf Course Stormwater Detention Project Trenching <br /> WO#UP3620 312317- 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.