My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Ic. Provide signed and stamped submittal of caving prevention system and cover system. <br /> I 6. New trenching shall not be started when earlier trenches need backfilling or the surfaces <br /> of streets or other areas need to be restored to a safe and proper condition. <br /> ID. Utility Crossings: Avoid horizontal and vertical conflicts with existing utilities. <br /> 1. Perform excavation within 24 inches of existing utility service in accordance with <br /> Iutility's requirements. <br /> 2. Vertical clearance between the newPiPexisting e and utilities shall be 12 inches <br /> minimum,unless otherwise noted on the Drawings. <br /> I3. Where existing utility lines are damaged or broken during trenching activities, the utility <br /> shall be repaired or replaced. For water or sewer bearing lines,care being taken to insure <br /> Ia smooth flow line and absolutely no leakage at the new joints. <br /> 4. All expenses involved in the repair or replacement of leaking or broken utility lines that <br /> I have occurred due to the Contractor's operations shall be borne by the Contractor, and <br /> the amount thereof shall be absorbed in the unit prices of its bid. <br /> I E. Water Lines Crossing Sewer Lines: Whenever water lines cross sewer lines,the Contractor <br /> shall comply with local Health Department requirements. <br /> 1. Wherever possible,the bottom of the water line shall be 18 inches or more above the top <br /> Iof sewer pipe. One full length of the water line pipe shall be centered at the crossing. <br /> 2. For clearances less than 1.5 feet,the Contractor shall replace the existing sewer pipe with <br /> I ductile iron or PVC of equal size,centered at the utility crossing, or shall encase existing <br /> sewer pipe with concrete for a minimum of 10 feet on both sides of crossing, as directed <br /> by the Engineer, at no additional cost to the Owner. <br /> IF. Excavate trenches to width and depth as indicated on Drawings. No additional payment will <br /> be provided for trenching activities beyond dimensions shown in the Drawings. <br /> 1 1. Excavation for trenches in which pipelines are to be installed shall provide adequate <br /> space for workers to place and joint the pipe properly and safely,but in every case the <br /> trench shall be kept to a minimum width. <br /> I2. The width of the pipe trench at and below the top of the pipe shall be such that the clear <br /> space between the barrel of the pipe and the trench shall not exceed 12 inches on either <br /> Iside of the pipe. <br /> 3. Excavation for utility vaults and other structures shall be wide enough to provide 18 <br /> Iinches between the structure surface and the sides of the excavation. <br /> 4. For pipe or utility vaults to have bedding material,excavate to a depth of 6 inches below <br /> I the bottom of the pipe or utility vault. Care shall be taken not to excavate below depths <br /> required. <br /> I <br /> ILegion Golf Course Stormwater Detention Project Trenching <br /> WO#UP3620 31 23 17 - 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.