My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 3.12 MARKING TAPE INSTALLATION <br /> A. Continuously install marking tape along centerline of all buried piping, install 24 inches <br /> below finished grade. Coordinate with piping installation drawings. <br /> 3.13 ELECTRONIC LOCATING FACILITY INSTALLATION <br /> A. Marker Balls: <br /> 1. Install according to manufacturer's recommendations and as shown or directed and !I <br /> according to the following requirements: <br /> a. Install marker balls directly above the pipe alignment at a depth no less than 3 feet I <br /> and no more than 4.5 feet below final surface grade. <br /> b. Install marker balls during trench backfill operations by placing the marker ball in <br /> compacted backfill. <br /> c. Cover marker ball with a minimum of 6 inches of backfill and compact backfill <br /> before continuing trench backfill operations. <br /> d. Install markers balls with trenchless pipe installations by core-drilling hole of a <br /> minimal diameter needed to allow clearance for placement of marker ball. Backfill <br /> with approved trench backfill,pavement base and pavement, as applicable. <br /> 2. Water Marker Ball Locations: Install at locations as required by Sewer Marker Ball <br /> Locations specified herein. <br /> 3. Sewer Marker Ball Locations: <br /> a. Install marker balls directly above connection points,termination points and all <br /> fitting locations,and at a minimum spacing of 50 linear feet on sewers with a straight <br /> horizontal alignment. <br /> b. Install marker balls at a minimum spacing of 25 lineal feet directly above sewer <br /> mains installed on a radius. <br /> c. Install marker balls on new or reconstructed sewer service laterals, directly above the <br /> centerline of the end of the lateral at the curb,property line or other end of lateral <br /> location, as directed. <br /> d. Install marker balls directly above every alignment change along sewer mains and <br /> service laterals. <br /> e. Install marker balls directly above manholes for manholes with buried covers. <br /> B. Tracer Wire and Terminal Appurtenances: <br /> 1. Tracer Wire: I <br /> I <br /> Legion Golf Course Stormwater Detention Project Trenching I <br /> WO#UP3620 31 23 17 - 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.