My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> a. Install as shown or directed directly over the pipe centerline and on top of the pipe <br /> zone in all sewer trenches, including mainline sewers, service laterals and storm <br /> sewer inlet leads. <br /> b. Connect mainline and service lateral tracer wires using either an approved direct-bury <br /> lug connector or direct-bury twist connector. <br /> c. Extend tracer wire to locator stations in manholes, locator boxes, storm inlets, or <br /> 111 other visually identifiable terminal appurtenances, allowing for access with electronic <br /> locating equipment, as shown or directed and according to the following <br /> requirements: <br /> 2. Locator Stations: <br /> a. Install locator stations as shown within manholes. <br /> b. Mount locator station to manhole wall within 18 inches of manhole rim with two <br /> stainless steel expansion anchors. <br /> c. Drill a minimum 3/8-inch diameter hole through the manhole wall within 18 inches <br /> of the finish grade of the manhole rim. <br /> d. Extend the tracer wire from the pipe trench in one continuous piece up the outside of <br /> the manhole and through the hole and into a locator station, and attach to one of the <br /> lugs in the locator station. <br /> e. When multiple tracer wires are terminated in manhole install a multilead locator <br /> station. <br /> f. Extend a ground wire from the locator station through a minimum 3/8-inch diameter <br /> hole in the manhole wall. <br /> g. Install ground wire approximately 3 feet deep, and extend from the outside manhole <br /> wall a minimum of 3 feet horizontally in any direction. <br /> • <br /> h. Seal all holes drilled in manhole walls with silicone sealant. <br /> 3. Storm Inlet Tracer Wire Termination: Terminate tracer wire inside inlet and directly over <br /> storm outlet pipe by placing tracer wire as follows: <br /> a. Drill a minimum 3/8-inch diameter hole through inlet wall to pass tracer wire through <br /> to inside inlet wall. <br /> b. Seal hole with silicon sealer or material approved by Engineer. <br /> c. Leave 6 inches of coiled tracer wire along inside of inlet wall approximately 3 inches <br /> below the inlet frame and grate or as directed by Engineer. <br /> 1 4. Service Lateral Tracer Wire Termination: Terminate tracer wire at ends of service laterals <br /> as shown or directed, as follows: <br /> I <br /> Legion Golf Course Stormwater Detention Project Trenching <br /> WO#UP3620 31 23 17 - 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.