Laserfiche WebLink
I <br /> a. Termination in Tracer Wire Locate Boxes: Extend the tracer wire in one continuous <br /> piece up vertically from the pipe trench and into the bottom of the locate box. Leave <br /> 18 inches of coiled tracer wire inside locate box. I <br /> b. Termination at 2-inch by 4-inch Markers: Extend tracer wire in one continuous piece <br /> directly up service lateral 2-inch by 4-inch markers and leave 18 inches of tracer wire <br /> wrapped around the exposed top end of 2-inch by 4-inch marker. <br /> 3.14 VISUAL IDENTIFICATION FACILITIES <br /> A. Tracer Wire Locate Boxes: Install tracer wire locate boxes directly over service laterals at <br /> property line, service boundary,or other location as shown or directed by the Engineer. <br /> B. Service Lateral Plastic or Copper Markers: <br /> 1. Install plastic or copper markers in the concrete curb directly over the centerline of the <br /> service lateral, as shown or directed by the Engineer. <br /> 2. Either plastic or copper markers may be used. <br /> 3. If there is not suitable concrete curb for marker placement,then install a lateral cleanout <br /> as close to property line as practical at location approved by Engineer. <br /> C. Service Lateral 2-inch by 4-inch Markers: <br /> 1. Place a 2-inch by 4-inch marker at the end of each new service lateral not connected to a <br /> building sewer. <br /> 2. Omit markers only as approved. I <br /> 3. Block the capped or plugged service lateral end with a wood block against undisturbed <br /> earth and install the marker. <br /> 111 <br /> 4. Extend the marker from the blocked service lateral invert to at least 12 inches above the <br /> existing or proposed finish ground surface. <br /> 5. Install marker in one piece.No splicing will be accepted. <br /> 6. Paint the exposed portion of the marker after its installation with quality quick drying <br /> enamel white paint for a storm only sewer and green paint for a sanitary or combined <br /> sewer. <br /> 7. After the paint has dried,use black,quick drying enamel, and neatly indicate the distance I <br /> from the ground surface to the top of the service lateral in feet and inches. <br /> 8. Do not disturb the position and location of the marker during the backfilling operation. 1 <br /> 9. If the marker is broken,moved out of location, or vertical alignment is changed during <br /> the backfilling operation,reopen the trench and replace the marker. I <br /> I <br /> Legion Golf Course Stormwater Detention Project Trenching I <br /> WO#UP3620 31 23 17 -20 <br />