My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> of this section <br /> Class 700 9-inch layer of 6" - 0 stone embankment meeting the test <br /> 1 requirements of this section <br /> Class 200 6-inch layer of 4" -0 stone embankment meeting the test <br /> requirements of this section <br /> Class 100 No filter blanket required <br /> Class 50 No filter blanket required <br /> I <br /> PART 3 EXECUTION <br /> 1 3.1 PREPARATION <br /> A. Remove brush, trees, stumps and other organic material from slopes to be protected by riprap <br /> and dress to a smooth surface. <br /> ' B. Remove all unsuitable material to the depth shown or directed and replace with approved <br /> material. <br /> C. Compact filled areas as specified in Section 31 23 17, Trenching. <br /> D. Provide riprap protection as early as the structure foundation construction permits. Prepare <br /> the surfaces to be protected as shown. <br /> E. Maintain the trench slopes,riprap geotextile or filter blanket until the riprap is placed. <br /> 3.2 RIPRAP GEOTEXTILE <br /> A. Install riprap geotextile as shown in the Drawings or as directed by the ENGINEER. <br /> 1 3.3 FILTER BLANKET CONSTRUCTION <br /> A. If required, place the filter blanket on the prepared area to the full specified thickness in one <br /> ' operation,using methods which will not cause segregation. <br /> B. The surface of the finished layer shall be reasonably even. <br /> ' 3.4 RIPRAP BACKING <br /> A. When indicated on the Drawings, the CONTRACTOR shall have the option of placing either <br /> riprap geotextile or a filter blanket behind the riprap. <br /> B. Install the backing per these specifications or as shown in the Drawings. <br /> ' 3.5 RIPRAP <br /> A. General - Unless otherwise directed, place the riprap protection as the embankment is <br /> constructed. Its placement shall lag behind embankment construction only as necessary to <br /> allow proper embankment construction and prevent mixture of embankment and riprap <br /> 1 material. <br /> ' Legion Golf Course Stormwater Detention Project Rip Rap <br /> WO#UP3620 31 37 00 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.