My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> B. Loose Riprap-Place riprap on the prepared area: <br /> 1. With a clam-shell, orange-peel bucket, skip or similar approved device which will <br /> contain the riprap material to its final destination. Do not open the bucket until it has been <br /> lowered to the slope on which the material is being placed <br /> 2. To its full course thickness in one operation I <br /> 3. According to the compaction requirements of Section 31 23 17, Trenching if riprap is <br /> placed on geotextile <br /> 4. By methods that do not cause segregation of riprap or displace the underlying material <br /> 5. To produce a compact riprap protection in which all sizes of material are placed in their <br /> proper proportion <br /> 6. With some hand placing,or rearranging of individual stones by mechanical equipment, or <br /> some other approved means to provide a smooth finished surface <br /> Where filter material and/or riprap are placed under water, increase their thicknesses as <br /> shown or as directed. <br /> C. Keyed Riprap - After placing loose riprap material, key the riprap into place by slapping the <br /> surface with a piece of armor plating (approximately 4 feet x 5 feet in size with a weight of <br /> approximately 5,000 pounds) or other approved means which will produce a nearly smooth <br /> surface. ' <br /> D. Riprap Basins - Excavate, backfill and construct riprap basins, without a riprap geotextile or <br /> filter blanket,at pipe outlets with Class 50 riprap as shown or as directed. I <br /> 3.6 MAINTENANCE - maintain the riprap protection until accepted. Replace any material displaced <br /> by any cause at no additional cost to the owner. <br /> • <br /> END OF SECTION <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> I <br /> Legion Golf Course Stormwater Detention Project Rip Rap ' <br /> WO#UP3620 313700-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.