My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.Division 32, Section 32 40 29, Golf Course Feature Construction - Fairways <br /> Part 2.02-A-1-e, delete Paragraph "e."in its entirety and replace with the following: <br /> "e. Peats (90:10 ratio) — The most commonly used organic component is a peat. It <br /> shall have a minimum organic matter content of 85% by weight as determined <br /> by loss on ignition (ASTM D 2974 Method D)." <br /> Part 3.03-A, delete Paragraph "A." in its entirety and replace with the following: <br /> "A. Install drainage per F-113 to F-116 — Drainage Plans and Details on Sheet <br /> GD-104." <br /> Part 3.06-A, delete Section "A." in its entirety. <br /> Part 3.09, delete the text "...and sod..." <br /> Part 3.10, delete Section "3.10"in its entirety and replace with the following: <br /> "3.10 Step 9, Grassing — Seed and Sod per Section 32 40 27 — Golf Course <br /> Grassing, Table 1. <br /> All fairways and roughs not receiving sod shall be seeded per grassing <br /> lines locations identified on the Grassing Plan. <br /> A. Note - the perimeter of all fairways shall be sodded with no less than a <br /> three-foot (3') strip of the appropriate sod. Sodding shall be in rows at right <br /> angles to the slope. <br /> B. Note - All pond banks from normal water operating level to a minimum of 24" <br /> past top of bank shall be sodded. <br /> C. Note - All slopes exceeding twenty percent (20%) shall be sodded. <br /> D. Note - A ten-foot by ten-foot (10' by 10') square around all inlets shall be <br /> sodded. <br /> E. After applying lime, fertilizer and amendments at the specified rates, drag to <br /> an even grade and roll for firmness. <br /> F. Fairways and Roughs: Grassing (seeding) shall be by Brillion Seeder or <br /> other method pre-approved by ENGINEER, in two (2) directions with a 30 <br /> degree difference in direction of passes. One-half (1/2) of the sowing rate <br /> shall apply to each direction. A well-experienced operator using precision <br /> equipment must do all seeding. <br /> 1. Apply one-half the specified application rate for seed and then <br /> immediately followed by a second application in a direction perpendicular <br /> to the first. <br /> 2. The application of the seed shall be not more than two inches (2") apart <br /> to a sown depth of one quarter inch (1/4") with a Brillion Seeder or <br /> Page 8 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.