My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> 33. Notice: A signed, written communication by the Contractor to the Owner as described in <br /> ARTICLE 10. NOTICE TO OWNER. <br /> 34. Notice to Proceed: The written Notice from the Owner or Owner's Representative to the <br /> Contractor authorizing and directing the Contractor to proceed with the Work and <br /> establishing the date on which the Contract Time begins. Multiple and partial Notices to <br /> Proceed may be issued on a single Project. <br /> 35. Over-absorbed Overhead: Over recovery of fixed indirect costs that occurs when a <br /> Contractor performs more overall Work than it otherwise would have performed. <br /> 36. Overhead: For the purpose of calculating additional compensation under this section of the <br /> Contract, Overhead shall include only those costs that are expended for the administration of <br /> the business as a whole. Such costs usually accrue or are incurred due to the passage of <br /> time, and cannot be traced to a particular project or Contract. Examples of possible <br /> Overhead costs include, but are not limited to, General and Administrative salaries and <br /> benefits, rent, general company insurance (exclusive of insurance on owned equipment that <br /> is directly job costed), depreciation on office facilities,utilities,maintenance, office supplies, <br /> general company accounting and legal fees (exclusive of amounts expended directly on any <br /> specific project), personal property taxes, general company business licenses, dues and <br /> subscriptions. <br /> a. The following costs and expenses are excluded from the definition and calculation of <br /> Overhead. Overhead costs that vary substantially with the volume of Work performed <br /> (as measured by billings) shall not be included in Overhead for the purpose of <br /> determining additional compensation for Extended or Unabsorbed Home Office <br /> Overhead or both. <br /> b. Examples of costs that are not included in Overhead include, but are not limited to, <br /> travel and business meetings, telephones,professional fees expended for the benefit of a <br /> specific project,union welfare benefits,payroll taxes and equipment rental. <br /> c. If related party transactions are included in a Contractor's Overhead, they shall be <br /> explicitly identified as related party transactions and shall not exceed amounts that <br /> would be incurred in an arms-length transaction for the provision of the same or similar <br /> goods and services. If such transactions exist and the amounts paid by the Contractor <br /> and included in Overhead are in excess of that which would normally be expended in an <br /> arms-length transaction, an adjustment, in the form of a reduction in the amount for <br /> calculation purposes, shall be included in any calculation in determining the amount of <br /> Allocable Overhead. <br /> d. Overhead shall not include any cost directly attributable to a particular project. If a cost <br /> can be traced to a particular Contract, the Contractor may not classify the cost as <br /> Overhead. <br /> e. Indirect or home office costs that vary substantially with the amount of Work <br /> performed shall not be included in the group of costs comprising Overhead. <br /> f. Overhead shall not include costs specifically disallowed by Federal Acquisition <br /> Regulations, Subpart 31.2—Contracts with Commercial Organizations, or its successor. <br /> Further, "Overhead"shall not include the costs of"field support services"that are more <br /> closely direct costs in nature,regardless of the manner in which the Contractor normally <br /> accounts for such costs. An example of such disallowed cost would be for material <br /> handling and expediting, which are costs incurred for the direct support and benefit of <br /> specific project(s). <br /> g. In addition to compliance with Federal Acquisition Regulations, Subpart 31.2 examples <br /> of specific costs not allowed in a calculation under this section of the Contract include, <br /> I <br /> Legion Golf Course Stormwater Detention Project November 30, 2017 <br /> WO#UP3620 00 72 13 -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.