My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> but are not limited to, Incentive Compensation paid to personnel classified as Overhead <br /> and otherwise includable under this section of Contract, travel and business meetings, <br /> employer paid benefits and taxes on direct payroll costs of any project, insurance costs <br /> directly identifiable to a specific project, penalties, and costs incurred regarding <br /> company owned equipment normally classified as a direct project costs. <br /> 37. Owner: The City of Everett,Washington. "Owner" and the "City" mean the same. <br /> 38. Owner's Representative: The person designated in writing and employed or retained by <br /> the Owner to act as its representative at the construction Site and to perform construction I <br /> inspection service and administrative functions relating to this Contract. The terms "Owner's <br /> Representative", "Engineer" and "Architect" are interchangeable. <br /> Jason Rapelyea, office phone 425-257-7727, cell phone 425-319-4331, email I <br /> jrapelyea(ceverettwa.(2ov <br /> 39. Person: Includes individuals, associations, firms, companies, corporations, partnerships, <br /> and joint ventures. <br /> 40. Physical Completion: Physical Completion Date is the day all of the Work is physically <br /> completed on the Project. All documentation required by the Contract and required by law <br /> does not necessarily need to be furnished by the Contractor by this date. <br /> 41. Progress Schedule: A schedule prepared and maintained by Contractor, describing the <br /> sequence and duration of the activities comprising the Contractor's plan to accomplish the <br /> Work within the Contract Time. <br /> 42. Project: The undertaking to be performed under the provisions of the Contract. <br /> 43. Punch List: List of incomplete items of Work and of items of Work that are not in <br /> conformance with the Contract Documents,prepared after Substantial Completion. <br /> 44. RCW: Means the Revised Code of Washington. I <br /> 45. Samples: Physical examples of materials, Equipment, or workmanship that are <br /> representative of some portion of the Work and which establish the standards by which such <br /> portion of the Work will be judged. <br /> 46. Schedule of Values: Allocation of Contract Sum to items of Work as provided in 9.1.1. <br /> Schedule of Values. <br /> 47. Shall: Required conduct. <br /> 48. Shop Drawings: All drawings, diagrams, illustrations, schedules, and other data or <br /> information, which are specifically prepared or assembled by or for Contractor and <br /> submitted by Contractor,to illustrate some portion of the Work. <br /> 49. Shown: Refers to information presented on the Drawings, with or without reference to the <br /> Drawings. <br /> 50. Site: Lands or areas indicated in the Contract Documents as being furnished by Owner upon <br /> which the Work is to be performed, including rights-of-way and easements for access <br /> thereto, and such other lands furnished by Owner that are designated for the use of <br /> Contractor. <br /> 51. Specifications: That part of the Contract Documents consisting of written descriptions of <br /> the technical features of materials, Equipment, construction systems, standards, and <br /> workmanship. <br /> I <br /> Legion Golf Course Stormwater Detention Project November 30, 2017 <br /> WO#UP3620 00 72 13 - 8 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.