My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS I <br /> 10. Instructions to Bidders; <br /> 11. Contractor's completed Bid Form; and I <br /> 12. Certifications and affidavits as required by this Contract and by law. <br /> 1.3 General I <br /> A. These parts complement each other in describing the complete Work. Any requirement in one <br /> part binds as if stated in all parts. The Contractor shall provide any work or materials clearly <br /> implied in the Contract even if the Contract does not mention it specifically. Any inconsistency in <br /> the parts of the Contract shall be referred to the Owner's Representative attention for a <br /> determination of the intended requirements. <br /> • B. The Work required in one part must be furnished even if not mentioned in other parts of the <br /> Contract. If any part of the Contract requires Work that does not include a description for how the <br /> Work is to be performed, the Work shall be performed in accordance with standard trade <br /> practice(s). For purposes of the Contract, a standard trade practice is one having such regularity <br /> of observance in the trade as to justify an expectation that the Contractor will follow or observe <br /> the practice in performing the Work. In case of any ambiguity, disagreement or Dispute over <br /> interpreting the Contract, the Owner's Representative's decision will be final as provided in these <br /> General Conditions. <br /> C. Approved Shop Drawings, other Contractor's Submittals, and the reports and drawings of <br /> subsurface and physical conditions are not Contract Documents. <br /> ARTICLE 2 SPECIFICATIONS AND DRAWINGS I <br /> 2.1 Interpretation of Specifications and Drawings <br /> A. The Specifications and Drawings are intended to be explanatory and supportive of each other. <br /> Work specified on the Drawings and not in the Specifications, or vice versa, shall be executed as <br /> if specified in both. In the event the Work to be done or matters relative thereto are not <br /> sufficiently detailed or explained in the Contract Documents, the Contractor shall immediately <br /> ask the Owner's Representative for further explanation and shall comply with such explanation. <br /> In the event of doubt or question arising respecting the true meaning of the Specifications or <br /> Drawings, Contractor shall refer to the Owner's Representative for his or her decision. <br /> B. The Specifications may vary in form, format and style. Some specification sections are written in <br /> varying degrees of streamlined or declarative style and some sections may be relatively narrative <br /> by comparison. Omissions of such words and phrases as "the Contractor shall," "in conformity <br /> with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and <br /> phrases shall be supplied by inference. Similar types of provisions may appear in various parts of <br /> a section or articles within a part depending on the format of the section. The Contractor shall not <br /> take advantage of any variation of form,format or style in making claims for extra Work. <br /> C. The cross referencing of specification sections under the subparagraph heading "Related Sections <br /> include but are not necessarily limited to:" and elsewhere within each specification section is <br /> provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross <br /> referencing provided and shall be responsible to coordinate the entire Work under the Contract <br /> Documents and provide a complete Project whether or not the cross referencing is provided in <br /> each section or whether or not the cross referencing is complete. <br /> D. Reference to standards, specifications, manuals, or codes of any technical society, organization, <br /> or association, or to Laws or Regulations, whether such reference be specific or by implication, I <br /> Legion Golf Course Stormwater Detention Project November 30, 2017 <br /> WO#UP3620 00 72 13 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.