My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> 52. Specify: Refers to information described, shown, noted or presented in any manner in any <br /> part of the Contract Documents. <br /> 53. Subcontractor: An individual or entity having a direct contract with Contractor or with any <br /> other Subcontractor for the performance of a part of the Work. <br /> 54. Submittals: The information required by the Contract Documents provided by Contractor <br /> to the Owner's Representative or Owner. <br /> 55. Substantial Completion: The day on which the Owner or Owner's Representative <br /> determines the Owner has full and unrestricted use and benefit of the Project, from both the <br /> operational and safety standpoints and only minor incidental Work, replacement of <br /> temporary substitute facilities, or minor correction or repair Work remains. Determination <br /> of Substantial Completion in whole or in part is solely at the discretion of the Owner. <br /> Substantial Completion does not mean complete in accordance with the Contract nor shall <br /> Substantial Completion of all or any part of the Project entitle the Contractor to Final <br /> Acceptance under the Contract. <br /> 56. Supplier: A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a <br /> direct contract with Contractor or with any Subcontractor to furnish materials or Equipment <br /> to be incorporated in the Work. <br /> 57. Total Float: The amount of time any given activity or path of activities may be delayed <br /> before it will affect the Completion Date. <br /> 58. Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, <br /> wheelchairs, and equestrian traffic. <br /> 59. Unabsorbed Overhead: The reduction or loss of contribution to recovery of the <br /> Contractor's Overhead costs realized by the result of reduced Project or Contractor billings, <br /> or both, due to any reason whatsoever, including a Project extension. <br /> 60. Unit Price Work: Refers to items of Work identified by unit prices in the bid form. <br /> 61. Work: Refers to the Project and the labor, materials, Equipment, supplies, services, and <br /> other items necessary for the execution, completion and fulfillment of the Contract. <br /> 1.2 Contract Documents <br /> A. The complete Contract includes: <br /> 1. Federal requirements that apply to this Contract and Project; <br /> 2. Supplemental agreements between Owner and Contractor, if any, subsequent to the Owner's <br /> execution of the Contract; <br /> l 3. Addenda; <br /> 4. The Contract; <br /> 5. Specifications, including, but not limited to, these General Conditions and other numbered <br /> Documents and Sections; <br /> 6. Supplementary Conditions,if any; <br /> 7. Drawings; <br /> 8. Change Orders; <br /> 9. City of Everett standard plans in effect as of the date Bids are opened; <br /> Legion Golf Course Stormwater Detention Project November 30, 2017 <br /> WO#UP3620 00 72 13 -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.