Laserfiche WebLink
11116 ALARM COMMUNICATOI <br /> NFPA72 (2013ed) 26.6.3.3.2 COMPLIANCE (CON'T): <br /> 26.6.3.3.2.4—Transmission Channels: <br /> 26.6.3.3.2.4(d) <br /> If private signal transmission facilities are used, the equipment necessary to transmit signals shall also <br /> comply with the requirements for duplicate equipment or replacement of critical components as <br /> described in 26.6.4.2 <br /> 26.6.3.3.2.4(d)—GSS Satisfaction:This requirement is met through UL testing of Guardian Security's <br /> Central Station. In addition, Guardian employs locally trained technicians,and has inventoried spare <br /> critical components on site. <br /> 26.6.3.3.2.4—Transmission Channels: <br /> 26.6.3.3.2.4(e) <br /> The system shall provide information that indicates the quality of the received signal for each RARSR <br /> supervising each RAT in accordance with 26.6.3.3.2 and shall provide information at the supervising <br /> station when such signal quality falls below the minimum signal quality levels set forth in 26.6.3.3.2 <br /> 26.6.3.3.2.4(e)—GSS Satisfaction:As set forth in UL Listed proprietary software by the manufacturer, <br /> RARSR's are supervised for quality. If the RARSR's fall below UL approved levels(via proprietary <br /> software),Central Station is notified via the proprietary software. <br /> 26.6.3.3.2.4 —Transmission Channels: <br /> 26.6.3.3.2.4(f) <br /> Each RAT shall be installed in such a manner so as to provide a signal quality over at least two <br /> independent two-way RF transmission channels, of the minimum quality level specified, that satisfies the <br /> performance requirements in 26.6.2.4 and 26.6.4. <br /> 26.6.3.3.2.4(f)—GSS Satisfaction:The requirements of referenced code 26.6.2.4 and 26.6.4are met via: <br /> • Units demonstrate FCC compliance labeling <br /> • All units in Seattle and Bellingham are installed to NFPA70 compliance. <br /> • All antennas in Seattle and Bellingham utilize single point grounding for protection of the <br /> possibility of damage by lightning or static discharging. <br /> • The requirements of referenced code 26.6.4 are met through UL testing of Guardian Security's <br /> Central Station. <br />