My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1931 ROCKEFELLER AVE 2018-02-23
>
Address Records
>
ROCKEFELLER AVE
>
1931
>
1931 ROCKEFELLER AVE 2018-02-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 11:17:57 AM
Creation date
2/23/2018 11:17:49 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
1931
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
InspectionType Date Result Remarks <br /> 1931 ROCKEFELLER AVE <br /> Permit: E9904-070 Status: MICROFILMED Issued: 4/20/99 Finaled: To Records: 6/28/05 <br /> Description: WIRE NEW HOUSE (HOUSE MOVE) <br /> Notes/Conditions: <br /> ROUGH-IN 5/21/99 CORR REQD ELECTRICAL <br /> 1-INSTALL MAIN BONDING JUMPER. 2-J-BOX BESIDE PANEL,ACCESSIBLE. 3-WHITE WIRE <br /> TO HOT WATER STRIP OR TAPE GREEN, USE BALCK& RED FOR HOTS. 4-USE PLATE <br /> MOUNT STRIKE KNOB. 5-BOND WATER WITHIN 5 OF ENTRY INTO BUILDING WITH#4 <br /> COPPER. <br /> FINAL 5/27/99 PART/CORR ELECTRICAL <br /> OK SERVICE ONLY- SUBJECT TO PUD LOCATION OF METER- 1.DRIVE GROUND RODS <br /> FLUSH&TIGHTEN CLAMPS 2.INSTALL J-BOX @ LIGHT IN PANEL RM 3.GFCI PROTECT <br /> BASEMENT RECEPTACLE 4.NEEDS FINAL 5. GROUND METAL BOXES <br /> SERVICE 5/27/99 PART/CORR ELECTRICAL <br /> OK SERVICE ONLY-SUBJECT TO PUD LOCATION OF METER- 1.DRIVE GROUND RODS <br /> FLUSH &TIGHTEN CLAMPS 2.INSTALL J-BOX @ LIGHT IN PANEL RM 3.GFCI PROTECT <br /> BASEMENT RECEPTACLE 4.NEEDS FINAL 5. GROUND METAL BOXES <br /> Permit: X9904-001 Status: MICROFILMED Issued: 4/20/99 Finaled: To Records: 6/28/05 <br /> Description: PLUMBING/MECH FOR HOUSE MOVE <br /> Notes/Conditions: <br /> ROUGH-IN 5/6/99 OTHER PLUMBING <br /> 2"MIN SINK. 2"MIN WASHER. COMPLETE PER U.P.C. 2" BATHTUB. TEST ALL NEW PIPING. <br /> GROUNDWORK 5/13/99 CORR REQD PLUMBING <br /> SECURE PLASTIC PIPING. VENT TO BE VERTICAL CONNECTION &42"ABOVE FLOOR. 3" <br /> VENT PROPER PLOW DIRECTION. PROTECT COPPER IN CONCRETE. <br /> DUCTWORK 5/27/99 CORR REQD MECHANICAL <br /> NOT READY. CALL FOR REINSPECTION. <br /> ROUGH-IN 5/24/99 CORR REQD PLUMBING <br /> PROPER SOLID CAP ON UNUSED DRAIN (NOT MECH PLUG). VENT TERMINATION TO BE 10 <br /> AWAY FROM WINDOW OR ABOVE HIGHEST ROOF (12"). <br /> ROUGH-IN 5/27/99 CORR REQD MECHANICAL <br /> NOT READY. CALL FOR REINSPECTION. <br /> FINAL 6/17/99 APPROVAL PLUMBING <br /> BLDG BURNED. <br /> FINAL 6/17/99 APPROVAL MECHANICAL <br /> BLDG BURNED. <br /> S:\MMcleod\Crystal\Inspection Records1001 Hewitt.rpt 8/13/2014 Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.