My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3003-07
>
Ordinances
>
Ordinance 3003-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 10:35:40 AM
Creation date
3/17/2016 10:35:39 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3003-07
Date
7/11/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
other applicable ordinances and regulations. If a Review Process I application is not <br /> categorically exempt under SEPA, the application shall be processed under Review <br /> Process II. Administrative determinations made by the planning department staff that are <br /> not associated with an application specifically listed in EMC 15.16.050, and that are <br /> categorically exempt under SEPA are not subject to the procedures and requirements of <br /> this title. <br /> Section 2. Section 3(B) of Chapter 4 of Ordinance No. 2530-01 (EMC 15.16.080), as <br /> amended by Section 1 of Ordinance No. 2719-03, which reads as follows: <br /> 15.16.080 Decisions included. <br /> A. Review Process II applications include the following administrative decisions:* <br /> 1. Alteration of a designated significant feature within an historic overlay zone; <br /> 2. Alteration of category II and III streams as provided by Section 19.37.150(B)(2); <br /> 3. Atrium appurtenance approval as provided by Section 19.39.040(B)(2); <br /> 4. Buffer width reduction for streams (Section 19.37.140(D)) or wetlands (Section <br /> 19.37.100(E)) or alteration of geologically hazardous areas or standard buffer(Section <br /> 19.37.080(C)) if proposal is not categorically exempt under SEPA; <br /> 5. Change or expansion of a nonconforming use (up to twenty-five percent) as provided <br /> by Section 19.38.030(C) and (D); <br /> 6. Comprehensive design plan permits as provided by Section 19.36.210; <br /> 7. Design guideline approval, when proposal includes modification of development <br /> standards and design guidelines and for projects not categorically exempt under SEPA; <br /> 8. Determination of proportionality for correctional facilities; <br /> 9. Determination of prohibited heavy manufacturing uses with potentially noxious <br /> impacts in M-1 and M-M zones as provided by Section 19.27.020(G)(19) and <br /> 19.28.020(D)(18); <br /> 10. Development of nonconforming lots which do not meet minimum lot area or building <br /> area requirements as provided by Section 19.38.080(C); <br /> 11. Development of previously altered ESAs when the proposal is not categorically <br /> exempt under SEPA as provided by Section 19.37.230(B)(1); <br /> 12. Deviation from historic overlay zone standards and guidelines; <br /> 13. Driveway access from public street for multiple family structures as provided by <br /> Section 19.15.080(B); <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.