Laserfiche WebLink
15.16.080 Decisions included. <br /> A. Review Process II applications include the following administrative decisions:* <br /> 1. Alteration of a designated significant feature within an historic overlay zone; <br /> 2. Alteration of category II and III streams as provided by Section 19.37.150(B)(2); <br /> 3. Atrium appurtenance approval as provided by Section 19.39.040(B)(2); <br /> 4. Buffer width reduction for streams (Section 19.37.140(D)) or wetlands (Section <br /> 19.37.100(E)) or alteration of geologically hazardous areas or standard buffer(Section <br /> 19.37.080(C)) if proposal is not categorically exempt under SEPA; <br /> 5. Change or expansion of a nonconforming use (up to twenty-five percent) as provided <br /> by Section 19.38.030(C) and(D); <br /> 6. Comprehensive design plan permits as provided by Section 19.36.210; <br /> 7. Design guideline approval, when proposal includes modification of development <br /> standards and design guidelines and for projects not categorically exempt under SEPA; <br /> 8. Determination of proportionality for correctional facilities; <br /> 9. Determination of prohibited heavy manufacturing uses with potentially noxious <br /> impacts in M-1 and M-M zones as provided by Section 19.27.020(G)(19) and <br /> 19.28.020(D)(18); <br /> 10. Development of nonconforming lots which do not meet minimum lot area or building <br /> area requirements as provided by Section 19.38.080(C); <br /> 11. Development of previously altered ESAs when the proposal is not categorically <br /> exempt under SEPA as provided by Section 19.37.230(B)(l); <br /> 12. Deviation from historic overlay zone standards and guidelines; <br /> 13. Driveway access from public street for multiple family structures as provided by <br /> Section 19.15.080(B); <br /> 14. Extension of amateur radio tower or antenna beyond sixty-five feet (Section <br /> 19.39.040(A)(3)); <br /> 15. Exterior finish for buildings in M-1 zone located within three hundred feet of <br /> residentially zoned properties (Section 19.27.020(A)); <br /> 16. Final PDO development plan as provided by Section 19.29.110; <br /> 5 <br />