My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3003-07
>
Ordinances
>
Ordinance 3003-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 10:35:40 AM
Creation date
3/17/2016 10:35:39 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3003-07
Date
7/11/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. Floodplain development permit application when a shoreline permit is not required <br /> (Section 19.30.060(B)); <br /> 18. Land divisions, as follows: <br /> a. Preliminary binding site plan; <br /> b. Preliminary binding site plan with site plan approval; <br /> c. Preliminary residential condominium binding site plan; <br /> d. Preliminary short subdivision alteration or vacation; <br /> e. Preliminary short subdivision of nine lots or less; <br /> f. Preliminary short subdivision with nonconforming structures; <br /> g. Preliminary subdivision of fifty lots or less; <br /> h. Preliminary subdivision alteration or vacation; <br /> i. Subdivision or short subdivision variance as provided in Section 18.32.010; <br /> 19. Land uses in WRM zone consistent with adopted management plan when not <br /> categorically exempt under SEPA (Section 19.30A.020); <br /> 20. Minor expansion of an existing special property use; <br /> 21. Outdoor use, activity, and storage: modification of standards; <br /> 22. Parking modification of ten percent or less if supported by parking analysis and <br /> modification does not involve residential use parking standards as provided by Section <br /> 19.34.070(A); <br /> 23. Parking reduction with transportation management plan (Section 19.34.070(D)); <br /> 24. Phase approval and development approval implementing an institutional overlay zone <br /> master plan or approval of minor revisions (cannot change use or character or allow <br /> increase in intensity of development) as provided by Section 19.33B.060; <br /> 25. Public park development not part of or in conformance with an adopted master plan <br /> or which exceeds the city's SEPA thresholds for categorical exemptions as provided by <br /> Section 19.33A.030; <br /> 26. Conceptual site plan review for projects that do not otherwise require a land use <br /> permit and are not categorically exempt under SEPA; <br /> 27. Project review for public projects that are not categorically exempt under SEPA; <br /> 28. Proposals required to be reviewed by the historic commission in the historic overlay <br /> zone per neighborhood conservation guidelines and historic zoning overlay standards (not <br /> including those listed under administrative review by staff which is Review Process I); <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.