Laserfiche WebLink
4 <br /> Comment ID # 4 Please provide the detailing for the one-hour glass and doors at the <br /> interior exit enclosure. <br /> See sheet A8.3. These details are provided on details 5,6,7,8. <br /> Comment ID # 5 The detailing of the exterior stairway and ramp, in some cases, <br /> does not include the handrail extension requirements of IBC 1012. <br /> See sheet A8.2. The handrail extensions have been added to the plans and <br /> elevations. <br /> Comment ID # 6 Bot handrails and guards are required at some of the exterior <br /> stairways per IBC 1012 and 1013. <br /> See sheet A8.3. A 42" guardrail has been added to all stair handrails. Detail 10 <br /> has been added to show this condition <br /> Sincerely, <br /> BOTESCH, NASH & HALL ARCHITECTS, P.S. <br /> Chris Raef <br /> Associate <br /> r b <br /> A <br />