• <br /> KirklandDynami " <br /> Closed Loop Extractor Process: <br /> The Closed-Loop Extractor consists of several pressure vessels assembled in-line and separated by ball <br /> valves and reducing connections. Item 1 is the Solvent Storage Vessel where the Butane solvent <br /> (R600/600a) is stored for use during the extraction. Item 1 is a purchased item contained in a DOT <br /> approved vessel. Items 2 and 3 are the Pressure Relief Valve and Pressure Gauge. These items may be <br /> assembled by using a common piping connection. Item 4 is the refrigerant recovery pump used recover <br /> and to compress the solvent after the extraction is complete. Item 5 is a1/4" NPT Ball valve assembled to <br /> the Extractor Top lid. This ball valve is used to separate or close the connection between the recovery <br /> pump and the extractor. A pressure relief valve is assembled between item 5 and the top lid to protect <br /> the vessel from over pressurization (>120 psi). Items 6 and 7 are 2" and 4" Bolted Sanitary Tri-Clamp <br /> fittings respectively, used to seal each vessel. The Tri-Clamp fitting includes a VITON seal between <br /> mating vessels. Item 8 is a 5 pound size Material Vessel made from a 4" diameter x 48" stainless steel <br /> ferruled pipe section. Item 9 is a 4"to 2" conical reducing ferrule. This section reduces the diameter <br /> from the material vessel down to 2". Item 10 is a straight ferrule pipe section with a W' NPS Tee at 90 <br /> degrees to the 2" section. Item 10 allows for the assembly of a %" NPT Ball valve and %"JIC Fitting <br /> Connection. Item 10 is used as a "Bottom-Up" Solvent fill option where the section just below the load <br /> is saturated with solvent and the material vessel is filled from the bottom rather than from the material <br /> vessel top lid (item 5). Item 11 is an assembled liquid filled pressure gauge for the Collection vessel. <br /> Item 12 is a 3/8" NPT ball valve used for connecting the refrigerant recovery pump during the recovery <br /> of the solvent. Item 13 is a 1.5" Bolted Sanitary Tri-Clamp fitting used at the Collection vessel lid. Item <br /> 14 is the column ball valve. Item 14 is a 2" sanitary ball valve that allows oils to be passed from the <br /> material vessel to the collection vessel. Item 15 is a 1.5" diameter Sight Glass. There are two Sight <br /> glasses used as visual process inspection ports to the collection vessel. Item 16 is a 10" diameter x <br /> 0.4375"thick collection vessel lid. This collection vessel lid is secured in place during the process and is <br /> assembled to many of the components of the Closed-Loop extractor. Item 17 is one of two 10" <br /> diameter Bolted Tri-Clamp Fittings for the Collection Vessel. Item 18 is the Collection Vessel 10"x 12" <br /> long stainless steel ferruled pipe section. <br /> Preparation for Extraction: <br /> The operator may load up to 5 lbs of prepared Marijuana within the Material Vessel (Item 8 figure 5.1). <br /> The operator replaces the top lid to the Material Vessel. The connection is secured by use of a high <br /> pressure bolted Tri-Clamp fitting. Prior to fitting the top lid to the material vessel a VITON seal is <br /> assembled to the fitting. The operator ensures that all ball valves within the closed-loop extractor <br /> assembly are in the closed positions and all seals are installed to the mating ferrule fittings. <br /> Prior to extraction the assembly is in a fixed and secure position and is not allowed to move. The <br /> extractor is mechanically anchored to the processing room wall using a vibration-damping clamping U- <br /> Bolt. This U-Bolt system is assembled using 2 x 1/2"-13 U-Bolt connections to a wall mounted steel plate <br /> (See page 32). <br /> 9/1/2015 Project: 150703 Terpp MK IV CLE Report Page 7 of 44 <br /> KD Doc. 150703ER <br />