Laserfiche WebLink
EVERETT COMPREHENSIVE PLAN <br />Some projects may not be completed in the Plan period but need to be identified for planning, <br />design, funding, and permitting procedures. Some projects may be revised or replaced with <br />subsequent detailed studies. The TIP is revised on an annual basis, and as projects get completed, <br />new projects will be advanced from the Mid -Term program to the current TIP. <br />Freeway Capacity Improvements <br />Additional capacity on Interstate 5 is currently under construction to extend the High Occupant <br />Vehicle (HOV) lanes north to US -2 and is expected to open by 2008. The Plan provides a further <br />extension of the HOV lanes to Marysville. The Plan includes improvements to existing <br />interchanges at 128th Street, SR 526, 41st Street/Broadway (under construction), Pacific <br />Avenue, US -2, Everett Avenue and East Marine View Drive to maximize the efficiency of I-5. <br />Once the existing interchanges are improved, the Plan provides for new interchanges at 112th <br />Street, 100th Street (HOV ramps), Madison Street, and 12th Street (Smith Island) to further <br />reduce congestion. <br />The US -2 Trestle over the Snohomish River valley may also be widened with HOV lanes to <br />complete the HOV system. However, additional east -west regional capacity will be required <br />towards the end of the Plan period. An extension of SR -526 to SR -2, or a comparable facility, <br />will provide congestion relief to US -2 and to I-5. The City will participate with other agencies in <br />planning an alignment of the regional facility to a potential interchange at Bickford Avenue. A <br />new interchange will also be provided on SR -526 at Hardeson Road to service the Southwest <br />Everett industrial area. <br />The potential costs of these Freeway Capacity improvements are estimated at more than $3 <br />Billion over the Plan period. <br />Arterial Capacity Improvements <br />SR -527 (19th Avenue) has recently been widened to five lanes to provide a contiguous north - <br />south arterial route. Airport Road, 4th Avenue, 100th Street, 112th Street, 116th Street, Casino <br />Road, South Broadway, and East Marine View Drive will also be widened. <br />A new arterial connection will be provided on 100th Street between SR -527 (19th Avenue) and <br />West Mall under I-5 with a possible extension to Everett Mall Way or Evergreen. New grade <br />separations will be provided for Pacific Avenue and Everett Avenue over the BNSF to access <br />Riverfront development properties. A grade separation of Lenora Avenue over the BNSF Main <br />Line will be provided unless a bypass of the Lowell neighborhood is developed. <br />Other arterial streets will be constructed to service new developments. Rucker may be realigned <br />to connect with West Marine View Drive and a new truck route planned. Broadway may be <br />reconfigured with HOV lanes between 41 st Street and Pacific Avenue to accommodate increased <br />bus traffic. <br />The potential costs of these Arterial Capacity improvements are estimated at more than $200 <br />Million over the Plan period. <br />TRANSPORTATION ELEMENT 48 <br />