My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3010-07
>
Ordinances
>
Ordinance 3010-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 3:50:41 PM
Creation date
3/18/2016 11:35:14 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3010-07
Date
7/18/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT COMPREHENSIVE PLAN <br />Table 4.1 <br />Future Vehicular Capacity Improvements <br />2006 to 20116 <br />Year TIP <br />2012 to 2017 <br />Mid -Term <br />2018 plus <br />Long -Term <br />Interstate <br />1. I-5 HOV Lanes: SR 526 to US 2 <br />Desi / Build <br />2. I-5 41 st Street Interchange <br />Desi / Build <br />3.1-5 112th St. P&R, HOV Ramps, Flyer <br />Stop <br />Design / Build <br />4.1-5 Downtown Interchanges <br />Design <br />Build <br />5. I-5 100th Street HOV Interchange <br />Design <br />Build <br />6.1-5 Everett Mall Way Ram (NB to SB) <br />Design <br />Build <br />7. I-5 Smith Island Interchange <br />Plan <br />Design <br />Build <br />8. I-5 East Marine View Dr Interchange <br />Design <br />Build <br />9.1-5 HOV Lanes from US 2 to SR 528 <br />Design <br />Build <br />10. I-5 128Interchange <br />Design <br />Build <br />11. I-5 128 St. HOV Ramps (Mariner P&R) <br />Design <br />Build <br />12. I-5 112th Street Interchange <br />Plan <br />Design <br />State Freeways <br />1. US -2 Trestle widening from I-5 to SR 204 Design Build <br />2. SR -526 Hardeson Interchange Design Build <br />3. SR -526 Extension from I-5 to US -2 Plan Design Build <br />Principal Arterials <br />1. SR -527 widening: 112th to 132nd Build <br />2. East Marine View Dr.: I-5 to Broadway Design/ Build <br />3. South Broadway: SR 526 to 41 st Street Plan/Design Build <br />4. Pacific Avenue BNSF Grade Separation Design Build <br />5. Rucker Realignment to West Marine View Desi Build <br />6. I-5 to Port of Everett Truck Route Plan/Design <br />Minor Arterials <br />1. 41 st Over BNSF to Riverfront / Simpson <br />Build <br />2. 112th Street Widening: 3rd Ave. to 19th <br />Ave. <br />Design / Build <br />3. Lowell Bypass or Lenora Over BNSF <br />Design <br />Build <br />4. 116th Street widening: SR -527 to 35th <br />Ave <br />Design / Build <br />5. 100th Street: Airport Rd. to Evergreen <br />Design/ Build <br />5. 100th St. Connection 19th Ave. to West <br />Mall <br />Design <br />Build <br />7. 100th St.: Evergreen to West Mall <br />Plan <br />Design <br />Build <br />6. 4th Ave. Widening 104th to 112th Streets <br />Desi / Build <br />Collector Arterials <br />ailwa <br />1. Everett Over BNSF: E. Grand to Railway <br />Desi / Build <br />2..Chestnut / Eclipse Mill from 36th to <br />Pacific <br />Design <br />Build <br />TRANSPORTATION ELEMENT 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.