My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2212-97
>
Ordinances
>
Ordinance 2212-97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 11:16:37 AM
Creation date
3/29/2016 11:16:28 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2212-97
Date
3/26/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 4: SITESWITH PREVIOUS DEVELOPMENT APPROVALS THAT HAVE NOT <br /> BEEN CONSTRUCTED OR ENTIRELY CONSTRUCTED <br /> Several proposed projects in the Subarea have completed environmental and zoning review, yet have <br /> not been constructed or entirely constructed. In addition, some projects have conceptual master plan <br /> approvals. Some of these projects are entitled to develop under specific regulations and mitigation <br /> requirements. The following discussion describes these projects and the status of construction on the <br /> sites. See Figure 6 for a map showing the location of these sites. Figure 7 shows current development <br /> in the Subarea, as well as master-planned development. <br /> Note that many of these projects were reviewed prior to the time the City's Zoning Code was revised in <br /> 1990 to include many landscaping and site and building design standards. Therefore, the City used <br /> development contracts (concomitant agreements to rezone ordinances) and its SEPA authority to <br /> condition projects to reduce the impacts of proposed development. The development standards were <br /> tailored to these projects individually, so many of the requirements can vary greatly between the <br /> projects. <br /> 4.1 Master Plan Projects <br /> Boeing <br /> In 1991, the City issued a decision allowing expansion of the Boeing site with an additional <br /> 5,600,000 sf of building and up to 33,500 total employees on the main Boeing Everett site <br /> (EIS #1-90). Approvals are based upon construction per the master plan and the SEPA Decision issued <br /> by the City. Construction of the expansion is on-going. <br /> Boeing is approved for development under the approved master plan up to 33,500 employees. In <br /> addition, Boeing retains approval for a few minor buildings or building expansions approved in the <br /> decision on the 1978 EIS. <br /> Boeing has additional expansion capacity beyond the facilities and 33,500 employees in their 1991 <br /> Master Plan. However, any development beyond that approved in their master plan is not authorized. <br /> Seaway Center <br /> A SEPA environmental review process was completed, and the Seaway Center Master Plan and <br /> Preliminary Binding Site Plan2 were approved by the City on July 9, 1987 (SEPA #15-87, BSP #1-87). <br /> The master plan included a conceptual master development plan and a binding site plan creating 11 lots <br /> on the approximately 301 acre site. The plan permitted the development of up to 3,220,000 square <br /> foot industrial park space with approximately 8,050 employees. The master plan includes standards for <br /> development of the site, including standards for building heights, buffers, landscaping, open space, <br /> building design, outdoor storage and fences, noise, air quality and vibration. <br /> 2 A binding site plan is a process for subdividing land which is used for business, commercial, and industrial <br /> properties. In the case of Seaway Center,the first binding site plan created 11 lots from the 301 acre parcel. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.