My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2212-97
>
Ordinances
>
Ordinance 2212-97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 11:16:37 AM
Creation date
3/29/2016 11:16:28 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2212-97
Date
3/26/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e M <br /> • <br /> Employment Holding Capacity* in Sub-Areas of the Everett Planning Area <br /> Area 1 Area 2 Area 3 Area 4 Area 5 Area 6 Total <br /> In City <br /> Emp. Capac. 39,000 10,200 40,800 3,500 15,500 3,500 112,000 <br /> Uninc. Area <br /> Emp. Capac. - 0 - - 0 - - 0 - 11,000 4,500 2,000 18,000 <br /> Subtotal 39,000 10,200 40,800 14,500 20,000 5,500 130,000 <br /> Minus Est. <br /> Employ. <br /> 1990 (#Jobs) 23,390 9,938 24,327 7,899 10,515 1,396 77,465 <br /> Additional <br /> Emp. Capac. <br /> in 2012 15,610 262 16,473 6,601 9,485 4,104 52,535 <br /> * The inventory of developable land is reduced in this estimate of employment holding <br /> capacity to account for the likelihood that certain lands will not be developed during the <br /> time frame of the comprehensive plan, and to allow for capital facilities to be located <br /> within some of the developable land. The actual employment capacity would be <br /> greater if all land were assumed to be developed within the remaining 15 years of the <br /> planning period for the comprehensive plan (2012). <br /> The above estimates of employment holding capacity do not include potential changes <br /> to land use designations within the unincorporated parts of the Everett Planning Area <br /> that may be proposed by Snohomish County to increase the employment capacity. <br /> The employment numbers in the above table have been modified to reflect <br /> • the additional detailed analysis conducted for the SW Everett/Paine Field Subarea <br /> Plan Environmental Impact Statement, <br /> • the City's experience that employment is increasing much faster in the Southwest <br /> Everett industrial area than in other portions of the City, and <br /> • the expectation that the adoption of the Southwest Everett Subarea Plan and Planned <br /> Action Ordinance, which creates an expedited permit process for development of <br /> the Subarea, will increase the employment growth rate in the Subarea over that <br /> previously anticipated. <br /> Section 2. The Faster Growth Alternative of the Southwest Everett Subarea Plan, Exhibit 1 to <br /> this Ordinance, is hereby adopted and Exhibit A of Ordinance No. 2021-94 as amended in <br /> Section 1 herein is hereby amended by the addition of this Southwest Everett Subarea Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.