My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2213-97
>
Ordinances
>
Ordinance 2213-97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 11:19:35 AM
Creation date
3/29/2016 11:19:27 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2213-97
Date
3/26/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1-2: Accessory Activities and Structures <br /> Analyzed in the SW Everett/Paine Field EIS <br /> :: •.. •. :: •i::::iiiiiiiiiiiiiii::iiiii::::::iiiiiiiii::i:::: ::::iii::i::i::i::i::i::::i::i:: :::.:: :::: :::::: :::::: ."'•. ::•:: :. .: :: •.l.::::..:.....::.:::.: <br /> Above ground fuel tanks, below ground fuel tanks of yes <br /> more than 10,000 gallons, including liquid chemical (See Sections 5 and 6 for additional information.) <br /> tanks, powder chemical tanks. <br /> Binding Site Plans yes <br /> Clean-up of contaminated sites under MTCA No, except that cleanup of petroleum contaminated sites <br /> from leaking underground fuel tanks is covered under <br /> some situations. See Section 7.2 for specific mitigation <br /> measures. <br /> Clearing activity/forest practices conducted in yes <br /> conjunction with a building permit. <br /> Clearing not associated with a specific use or permit. Yes (limited clearing) <br /> See Section 4.3.2 for specific mitigation measures. <br /> Communication facilities, such as switching stations yes <br /> Communication lines: Yes: These are categorically exempt from SEPA <br /> review. <br /> Culverts in streams. Yes, when needed to provide access to parcels and <br /> approved by Fish and Wildlife. Must comply with <br /> Everett's Environmentally Sensitive Areas Ordinance, <br /> HPA must be obtained. (See Section 4 for additional <br /> information and mitigation measures.) <br /> Demolition of existing structures. yes <br /> (See Section 3.5 of the EIS for additional information.) <br /> Detention and water quality features, such as detention yes <br /> ponds, infiltration structures, biofiltration swales, (See Section 4 for additional information.) <br /> wetponds. <br /> Note that regional detention ponds discussed in the <br /> drainage basins plans are covered, except that ponds <br /> located in streams or wetlands are not covered. <br /> Driveways, driving aisles, pedestrian improvements, yes <br /> including trails. <br /> Fences yes <br /> Fire hydrants yes <br /> Grading activity, including excavation and fill yes <br /> associated with a specific building, development or <br /> Public Works permit. <br /> Temporary stockpiling of earth on sites that have been <br /> legally cleared. <br /> Grading activity not associated with a specific No, except that limited grading associated with clearing <br /> development, such as stockpiling of earth on sites a site is permitted. (see clearing) <br /> where clearing would be required, or preparing a site <br /> for development prior to having an approved site plan <br /> review and building permit application. <br /> Hazardous waste storage, handling and treatment. yes <br /> See Section 7.2 <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.