My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2213-97
>
Ordinances
>
Ordinance 2213-97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 11:19:35 AM
Creation date
3/29/2016 11:19:27 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2213-97
Date
3/26/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.i::. '. : ::'. .. :::ii:L•:C.iii:ii:�:.::.::.::.iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii:.i:.i:.iii:.::vi:.::.::.iii:.::.i:.::.i:.::.i ii:.i:': <br /> Jet engine run-up test stations If within noise levels of 1991 Boeing Expansion EIS. <br /> See Section 7.1 <br /> Landscaping yes <br /> Loading areas yes <br /> Natural gas distribution lines exempt from SEPA <br /> Outdoor display areas for retail use yes <br /> Outdoor Storage yes <br /> Parking lots (automobiles, trucks, airplanes), including yes <br /> surface parking, parking in structures, bicycle parking <br /> facilities. <br /> Recreational facilities constructed on-site for employees yes <br /> Refuse disposal and recycling areas yes <br /> Repair/replacement of dams and reservoirs. no <br /> Facilities in the area that meet the definition of a dam: <br /> the Seaway Center detention pond, the Boeing detention <br /> pond, and the area where Merrill Creek Parkway <br /> crosses Merrill and Ring Creek, and a detention pond <br /> north of SR 526 in Merrill and Ring Creek. <br /> Retaining walls, rockeries yes <br /> (See Section 1.3 for additional information.) <br /> Sewer and water lines Yes, except water line across Japanese Gulch and <br /> sewer facilities for properties west of Japanese Gulch <br /> are not covered. <br /> Sewer and water lines of 8" diameter and less are <br /> exempt(if consistent with Water System Plan). <br /> See BMPs in Sections 3 and 4 for construction in and <br /> adjacent to ESAs. <br /> Signs yes, except billboards <br /> Street frontage improvements and other minor yes <br /> improvements identified in this EIS analysis, including <br /> curb, gutter, sidewalks, medians, traffic signals, <br /> bicycle lanes, transit facilities (pullouts, shelters). <br /> Major street improvements such as the addition of no <br /> lanes, construction of new roadways, freeway on- <br /> ramps, etc. <br /> Temporary construction shacks yes <br /> Use of groundwater through wells no <br /> Vehicle washing areas yes <br /> (See Section 3.4 of the EIS for additional information.) <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.