My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2213-97
>
Ordinances
>
Ordinance 2213-97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 11:19:35 AM
Creation date
3/29/2016 11:19:27 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2213-97
Date
3/26/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.1.3 Mitigation Measures <br /> 1. All power lines carrying a voltage of less than 15 kV must be undergrounded. (SEPA Land and <br /> Shoreline Use Policies) <br /> 2. When maintaining corridors for aboveground lines near environmentally sensitive areas, to the <br /> extent feasible, the PUD shall leave cut tree stumps as snags for wildlife. The corridors must be <br /> replanted with native species that will not grow high enough to impact the lines. (SEPA Plant and <br /> Animal Policies) <br /> 6.2 NATURAL GAS <br /> 6.2.1 Threshold <br /> Washington Natural Gas forecasts an adequate supply of natural gas for the SW Everett Subarea. <br /> View issues must be addressed in the Review Process II or III application for aboveground utilities. <br /> 6.2.2 Mitigation Required by Existing Regulations <br /> All development must comply with the regulations and standards in effect at time of application, <br /> including, but not limited to, the following: <br /> City of Everett <br /> Public Works Design and Construction Standards and Specifications <br /> Zoning Code (EMC Title 19) <br /> 6.2.3 Mitigation Measures <br /> None <br /> 6.3 NON-RENEWABLE RESOURCES <br /> 6.3.1 Threshold <br /> New mining activities are not addressed in this SEPA review. <br /> 6.3.2 Mitigation Required by Existing Regulations <br /> All development must comply with the regulations and standards in effect at time of application, <br /> including, but not limited to, the following: <br /> Department of Natural Resources (DNR) <br /> Washington State Surface Mining Act (RCW 78.44) <br /> 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.