Laserfiche WebLink
6.1.3 Mitigation Measures <br /> 1. All power lines carrying a voltage of less than 15 kV must be undergrounded. (SEPA Land and <br /> Shoreline Use Policies) <br /> 2. When maintaining corridors for aboveground lines near environmentally sensitive areas, to the <br /> extent feasible, the PUD shall leave cut tree stumps as snags for wildlife. The corridors must be <br /> replanted with native species that will not grow high enough to impact the lines. (SEPA Plant and <br /> Animal Policies) <br /> 6.2 NATURAL GAS <br /> 6.2.1 Threshold <br /> Washington Natural Gas forecasts an adequate supply of natural gas for the SW Everett Subarea. <br /> View issues must be addressed in the Review Process II or III application for aboveground utilities. <br /> 6.2.2 Mitigation Required by Existing Regulations <br /> All development must comply with the regulations and standards in effect at time of application, <br /> including, but not limited to, the following: <br /> City of Everett <br /> Public Works Design and Construction Standards and Specifications <br /> Zoning Code (EMC Title 19) <br /> 6.2.3 Mitigation Measures <br /> None <br /> 6.3 NON-RENEWABLE RESOURCES <br /> 6.3.1 Threshold <br /> New mining activities are not addressed in this SEPA review. <br /> 6.3.2 Mitigation Required by Existing Regulations <br /> All development must comply with the regulations and standards in effect at time of application, <br /> including, but not limited to, the following: <br /> Department of Natural Resources (DNR) <br /> Washington State Surface Mining Act (RCW 78.44) <br /> 36 <br />