8.6 PUBLIC WATER SUPPLIES <br /> 8.6.1 Threshold <br /> The analysis in the Water System Plan projected the overall future peak-hour demand for the area at <br /> 2.7 gpm/acre (approximately 4,000 gpa/day peak flow), and assumed fire flow requirements of <br /> approximately 3,500 gpm for commercial and industrial/manufacturing uses. Based upon the proposed <br /> design of the water system, any development using more than 2.7 gpm/acre has the potential to affect <br /> water pressure on other sites. Additional analysis will be required for development proposals with a <br /> peak hour demand above 2.7 gpm/acre and/or a fire flow requirement of 3,500 gpm or greater. The <br /> additional analysis may be as simple as calculations completed by the Public Works Department prior <br /> to a pre-application meeting on a specific development proposal. The additional analysis must <br /> determine how the proposal's water demand will affect the entire water supply and distribution system. <br /> Projects with no additional major improvements needed and no adverse cumulative impacts on the <br /> water supply and distribution system are covered by this analysis. <br /> The 2.7 gpm/acre is an overall average peak hour demand assumed for planning in large areas such as <br /> the study area. However, there will undoubtedly be site-specific proposals with larger demand. For <br /> example, large irrigation systems can exceed 50 gpm/acre demand. Other land uses with demands <br /> much lower than 2.7 gpm/acre, such as warehouses, are assumed to occur to offset the higher demand <br /> land uses, resulting in an overall area wide average of 2.7 gpm/acre. <br /> The impacts of construction of the new water line to service development west of Japanese Gulch were <br /> not covered in the EIS. Additional SEPA analysis is required to review alternative routes for the line <br /> which will minimize the impacts of the proposal. <br /> 8.6.2 Mitigation Required by Existing Regulations <br /> All development must comply with the regulations and standards in effect at time of application, except <br /> as otherwise provided in this Mitigation Decision Document, including, but not limited to, the <br /> following: <br /> City of Everett <br /> Design and Construction Standards and Specification Manual, Section 5, Water Distribution. <br /> Water Regulations and Rates (EMC 14.16) <br /> Water Connection Fees (Ordinance 1171-85, as amended) <br /> Mukilteo Water District <br /> Mukilteo Water District standard specifications and requirements for extensions <br /> 8.6.3 Mitigation Measures <br /> 1. Looped water mains may be required for some sites to meet fire flow requirements and to protect <br /> water quality. Pressure reducing valves may be required when looped systems are constructed. <br /> (SEPA Public Services and Utilities Policies) <br /> 43 <br />